Original source · versioned page text
Attachment B - Code Compliance Assessment
Performance Outcomes Acceptable Outcomes Planning Comment
Extractive industry is sited to not cause No acceptable outcome provided The proposed development is not an
conflict with incompatible or sensitive land extractive industry use
uses.
PO15 N/A
Extractive industry in proximity to the No acceptable outcome provided The proposed development is not an
Noosa River system only occurs where— extractive industry use
(a) there is a clear demonstrated need;
(b) no feasible and prudent alternatives
are available; and
(c) it can be demonstrated that the
intrinsic natural values and
resources of the river system can be
managed and protected in an
ecologically sustainable manner.
Haulage routes
PO16 N/A
Haulage routes associated with extractive No acceptable outcome provided The proposed development is not an
resources: extractive industry use
are located on roads where the haulage
route will maintain the safety of the road
network and minimise adverse impacts on
premises within the transport route,
particularly residential and urban
residential amenity;
avoid conflicts with other land uses;
are located on roads which are of
adequate construction and which may be
jrey.au | (07) 3106 3221 | [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.