Original source · versioned page text
Attachment B - Code Compliance Assessment
Performance Outcomes Acceptable Outcomes Planning Comment
upgraded as part of the utilisation of the
extractive resource; and
are adequately maintained as a part of the
utilisation of the extractive resource.
PO17 N/A
The utilisation of any extractive resource No acceptable outcome provided The proposed development is not an
or the rehabilitation of the site does not extractive industry use
result in adverse visual impacts from major
roads.
Vehicle access and manoeuvring
PO18 N/A
Vehicle access to, from, and within the No acceptable outcome provided The proposed development is not an
extractive industry site: extractive industry use
(a) is adequate for the type and volume
of traffic to be generated;
(b) does not create or worsen any
traffic hazard;
(c) ensures disturbance to surrounding
land uses is minor and that impacts
from emissions are minimised; and
(d) ensures no tracking of sediment or
material onto the road network
results from the transport of
materials associated with the
haulage of extractive resources.
Site planning
PO19 N/A
No acceptable outcome provided
jrey.au | (07) 3106 3221 | [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.