Original source · versioned page text
Attachment B - Code Compliance Assessment
Performance Outcomes Acceptable Outcomes Planning Comment
The design, operation and staging of the
extractive industry has regard to the visual
character of the locality
Buffers, Separation and Amenity
PO25 N/A
The extractive industry is located on a site No acceptable outcome provided The proposed development is not an
which has sufficient area to provide extractive industry use
adequate setback of operations from road
frontages, site boundaries, surrounding
residential uses and other sensitive
receptors, such that the extractive industry
achieves an acceptable standard of visual
amenity and control over noise, light, dust
and vibration impacts.
PO26 N/A
The extractive industry is adequately No acceptable outcome provided The proposed development is not an
separated from sensitive uses to minimise extractive industry use
potential for nuisance.
PO27 N/A
The extractive industry provides onsite No acceptable outcome provided The proposed development is not an
drainage that is designed, constructed and extractive industry use
maintained to:
(a) avoid erosion;
(b) prevent pollution of groundwater
and surface water;
(c) protect downstream water quality;
jrey.au | (07) 3106 3221 | [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.