Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Attachment B - Code Compliance Assessment

of 159
 Performance Outcomes                           Acceptable Outcomes              Planning Comment
 The design, operation and staging of the                                        The proposed development is not an
 extractive industry promotes the efficient                                      extractive industry use
 utilisation of the resource.
 PO20                                                                            N/A
 The design, operation and staging of the       No acceptable outcome provided   The proposed development is not an
 extractive industry mitigates vibration,                                        extractive industry use
 noise, dust, lighting and other impacts on
 the surrounding area.
 PO21                                                                            N/A
 The design, operation and staging of the       No acceptable outcome provided   The proposed development is not an
 extractive industry avoids and minimises                                        extractive industry use
 impacts on ecologically important values to
 the greatest extent and where impacts
 cannot be avoided, the loss or decrease in
 values is minimised or offset.
 PO22                                                                            N/A
 The design and operation of the extractive     No acceptable outcome provided   The proposed development is not an
 industry minimises and mitigate impacts                                         extractive industry use
 on natural fluvial processes and river bank
 stability.
 PO23                                                                            N/A
 The design, operation and staging of           No acceptable outcome provided   The proposed development is not an
 extractive industry optimises potential                                         extractive industry use
 alternative land uses after the cessation of
 extractive activities.
 PO24                                                                            N/A
                                                No acceptable outcome provided   The proposed development is not an
                                                                                 extractive industry use



jrey.au | (07) 3106 3221 | [email protected]

Log in to download the original (Attachment B - Code Compliance Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.