Original source · versioned page text
Attachment B - Code Compliance Assessment
Performance Outcomes Acceptable Outcomes Planning Comment
Extractive industry operation areas are The proposed development is not an
fenced to prevent unauthorised or extractive industry use
accidental public entry.
PO32 N/A
Development does not compromise the No acceptable outcome provided The proposed development is not an
stability, safety or operation of extractive industry use
infrastructure.
PO33 N/A
Development is designed and managed to No acceptable outcome provided The proposed development is not an
minimise the risk and impact of any extractive industry use
accidental spills or releases of chemicals
and other materials that may contaminate
soil, stormwater, groundwater or air.
Landscaping
PO34 N/A
Landscaping complements biodiversity No acceptable outcome provided The proposed development is not an
values in the surrounding area. extractive industry use
Rehabilitation
PO35 N/A
Rehabilitation of the site, over the life of No acceptable outcome provided The proposed development is not an
the project and on its completion: extractive industry use
(a) provides progressive/ staged
rehabilitation works;
(b) includes appropriate clean-up
works (taking particular account of
areas of possible soil or water
contamination);
(c) results in a stable final landform;
jrey.au | (07) 3106 3221 | [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.