Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Attachment B - Code Compliance Assessment

of 159
 Performance Outcomes                          Acceptable Outcomes              Planning Comment
    (d) provides suitable drainage and
         hydraulic conditions; and
    (e) achieves a suitable degree of
         revegetation consistent with
         potential post extraction land use.
 PO36                                                                           N/A
 Rehabilitation allows for suitable use of     No acceptable outcome provided   The proposed development is not an
 any water storage created through the                                          extractive industry use
 extraction process, having regard to water
 quality, hydraulic conditions, land form
 and vegetation.
 PO37                                                                           N/A
 Rehabilitation works for each operational     No acceptable outcome provided   The proposed development is not an
 stage are bonded to ensure the effective                                       extractive industry use
 return of disturbed areas to acceptable
 land use suitability.




jrey.au | (07) 3106 3221 | [email protected]

Log in to download the original (Attachment B - Code Compliance Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.