Original source · versioned page text
Attachment B - Code Compliance Assessment
Performance Outcomes Acceptable Outcomes Planning Comment
Editor’s Note—Further details are provided
in the Water Quality and Drainage Code.
PO18 Complies
Parking areas are designed to ensure No acceptable outcome provided Earthworks and fill will raise the ground
drainage without the use of pumps or floor parking area to allow for slope to
other electrical apparatus. ensure drainage to Rene Street.
PO19 AO19 Complies
Site layout and building design provides for Below ground components of buildings, The site layout and building design allows
soft landscaping to be established. including carparks, do not extend beyond for soft landscaping to be provided along
the above ground footprint to allow for the the front setback and rear setback.
provision of landscaping, particularly
within building setbacks.
jrey.au | (07) 3106 3221 | [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.