Original source · versioned page text
Attachment B - Code Compliance Assessment
9.4.2 Earthworks Code
9.4.2.1 Application
(1) This code applies to assessable development identified as requiring assessment against the Earthworks code by the tables of
assessment in Part 5 (Tables of Assessment).
(2) All provisions in this code are assessment benchmarks for applicable assessable development.
9.4.2.2 Purpose and Overall Outcomes
(1) The purpose of the Earthworks code is to ensure earthworks do not unreasonably impact on the natural environment or other
properties and provide a safe and secure work environment.
(2) The overall outcomes sought for the Earthworks code are:
(i) Earthworks are designed and constructed to be structurally sound.
(ii) All onsite works provide land stability (including differential settlement or expansion in reactive soils).
(iii) Earthworks avoid contamination of land.
(iv) Flooding and drainage are appropriately addressed.
(v) Groundwater, watercourses and wetlands are protected.
(vi) The loss of native remnant or regrowth vegetation is avoided.
Table 9.4.2.3 - Criteria for assessment
Effects of works Table 9.4.2.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes Planning Comment
Assessable development
jrey.au | (07) 3106 3221 | [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.