Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Attachment B - Code Compliance Assessment

of 159
 Performance Outcomes                           Acceptable Outcomes                             Planning Comment
 Dam location and construction does not            (a) the land has a slope of less than
 impact upon neighbouring properties or                25% (1:4);
 road reserves, in terms of—                       (b) the earthworks including cut and fill
    (a) hydrology;                                     batters and retaining walls are
    (b) alteration of existing overland flow           setback a minimum of 50 metres
        paths and patterns;                            from the property boundary; and
    (c) landslide or failure of dam wall; and      (c) the size of the lot is greater than 5
    (d) effluent disposal areas.                       hectares.

                                                AO12.2
                                                Where the site is in the Rural residential
                                                zone or the Rural zone and the lot is less
                                                than 5 hectares:
                                                   (a) the land has a slope of less than 1:6;
                                                   (b) the earthworks including cut and fill
                                                       batters and retaining walls are
                                                       setback a minimum of 20 metres
                                                       from the property boundary; and
                                                   (c) the dam work involves less than
                                                       500m³ of material.

                                                AO12.3
                                                For all other zones—
                                                No acceptable outcome provided




jrey.au | (07) 3106 3221 | [email protected]

Log in to download the original (Attachment B - Code Compliance Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.