Original source · versioned page text
Attachment B - Code Compliance Assessment
Performance Outcomes Acceptable Outcomes Planning Comment
Dam location and construction does not (a) the land has a slope of less than
impact upon neighbouring properties or 25% (1:4);
road reserves, in terms of— (b) the earthworks including cut and fill
(a) hydrology; batters and retaining walls are
(b) alteration of existing overland flow setback a minimum of 50 metres
paths and patterns; from the property boundary; and
(c) landslide or failure of dam wall; and (c) the size of the lot is greater than 5
(d) effluent disposal areas. hectares.
AO12.2
Where the site is in the Rural residential
zone or the Rural zone and the lot is less
than 5 hectares:
(a) the land has a slope of less than 1:6;
(b) the earthworks including cut and fill
batters and retaining walls are
setback a minimum of 20 metres
from the property boundary; and
(c) the dam work involves less than
500m³ of material.
AO12.3
For all other zones—
No acceptable outcome provided
jrey.au | (07) 3106 3221 | [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.