Attachment B - Code Compliance Assessment

of 159
 Performance Outcomes                     Acceptable Outcomes                    Planning Comment
                                                                                 At most, there is a cut of approximately 2.9
                                                                                 metres proposed as calculated from the
                                                                                 West Elevation plans.
 Infrastructure protection
 PO10                                                                            Complies
 Earthworks and vehicular access do not   No acceptable outcome provided         As part of the development works, it is not
 adversely impact on the capacity,                                               expected that earthworks and vehicular
 operations and maintenance of existing                                          access do not adversely impact on the
 infrastructure.                                                                 capacity, operations and maintenance of
                                                                                 existing infrastructure. Works along the
                                                                                 proposed driveway ramp from the ground
                                                                                 floor level to the lower floor level will take
                                                                                 into consideration the location of existing
                                                                                 stormwater infrastructure. Care will be
                                                                                 taken to avoid impact.
 Environmental protection                                                        Complies
 PO11                                     No acceptable outcome provided         The site does not involve impacts to known
 Earthworks minimise any adverse impact                                          groundwater, watercourses, drainage lines,
 upon groundwater, watercourses,                                                 wetlands and native vegetation. Whilst the
 drainage lines, wetlands, and native                                            site is adjacent to a biodiversity corridor,
 vegetation.                                                                     earthworks associated with this
                                                                                 development will not impact and erosion
                                                                                 and sediment control measures will be in
                                                                                 place during construction.
 Dams
 PO12                                     AO12.1                                 N/A
                                          Where the site is in the Rural zone—   No dam proposed.




jrey.au | (07) 3106 3221 | [email protected]

Log in to download the original (Attachment B - Code Compliance Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.