Original source · versioned page text
Attachment B - Code Compliance Assessment.pdf
Performance Outcomes Acceptable Outcomes Planning Comment
run-off from contributing
catchments and the
preservation of all-weather
access;
(c) kerb and channel—
(i) controls vehicle movement by
delineating the carriageway for
all users;
(ii) conveys road pavement run-off
to stormwater drainage in a
manner that allows the road to
be trafficable in 1%AEP local
rainfall events; and
(d) verges and footpaths provide—
(i) safe access for pedestrians and
cyclists clear of obstructions;
(ii) an access area for vehicles onto
properties;
(iii) a corridor allocated for services
and utilities; and
(iv) additional amenity for minor
roads.
Activity Centres and Community Facilities Table 9.4.7.3 Criteria for assessable development (part)
Performance Outcomes Acceptable Outcomes Planning Comment
Activity Centres and Community Facilities
PO11 AO11.1 N/A
jrey.au | (07) 3106 3221 | [email protected]
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment B - Code Compliance Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.