Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Attachment B - Code Compliance Assessment.pdf

of 159
 Performance Outcomes                             Acceptable Outcomes                       Planning Comment
              run-off from contributing
              catchments and the
              preservation of all-weather
              access;
    (c) kerb and channel—
        (i) controls vehicle movement by
              delineating the carriageway for
              all users;
        (ii) conveys road pavement run-off
              to stormwater drainage in a
              manner that allows the road to
              be trafficable in 1%AEP local
              rainfall events; and
    (d) verges and footpaths provide—
        (i) safe access for pedestrians and
              cyclists clear of obstructions;
        (ii) an access area for vehicles onto
              properties;
        (iii) a corridor allocated for services
              and utilities; and
        (iv) additional amenity for minor
              roads.


Activity Centres and Community Facilities           Table 9.4.7.3 Criteria for assessable development (part)

 Performance Outcomes                             Acceptable Outcomes                       Planning Comment
 Activity Centres and Community Facilities
 PO11                                             AO11.1                                    N/A



jrey.au | (07) 3106 3221 | [email protected]

Log in to download the original (Attachment B - Code Compliance Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.