Council archive · source document
SUPERSEDED Approved Plans OPW17/0561
Plans and drawings: the text below has words only, no drawings.
APPENDIX F: Installation of piles and capping Environmental Control Plan to prevent pollution from concreting operations during the construction (Grouting & Pile Caps) Background. The use of concrete materials is reduced to a minimum due to the use of a micro piling system that is to be craned onto site. The small volumes of concrete required allow the use of a small concrete grout pump with reduced line size to grout piles and concrete pile caps. This system gives precise control to the operators making spillage and cleaning requirements negligible. Controls: The builder/site manager will ensure the following best practice sediment control measures including a designated wash down area are in place before work starts and are adequately maintained throughout construction. The designated wash down area is to be located within the site on the existing paved driveway with sediment control screening in place and an appropriate HDP waste receptacle drum will be available to retain any sediment waste from swept up spillage or cleaning of equipment. The receptacle drum will be exchanged as required, fitted with a sealed lid and the contents removed from site regularly to the concrete supplier’s authorised off site recycling and disposal facility. The builder/site manager will ensure all workers on the site are aware of their responsibilities to minimise pollution including the concrete pump operator who will directly monitor equipment to ensure leakage and spillage does not occur. The concrete supplier will be selected on the basis that appropriate training has been provided to their agitator truck drivers, and that they provide appropriate details and resources to enable them to complete a delivery without causing pollution. The agitator truck driver who will be required to be familiar with the Concrete Safe Site Delivery Guidelines (available from Cement Concrete & Aggregates Australia at www.concrete.net.au under ‘A-Z Directory’) and will have sufficient training and experience to deliver concrete to site and then return to the batch plant without causing environmental harm through spillage or leakage of concrete. The driver will inspect and maintain the truck at all times and will be instructed to raise any concerns about the pollution controls on site with the builder/site manager. The driver must also ensure sediment is not tracked off site. If this occurs, it will be swept up and put back into the site sediment receptacle drum. Where possible, the delivery of concrete will occur within the site, using small trucks, to ensure the risk of spillage contaminating the stormwater system is minimised. If site access is restricted and the delivery of concrete must occur on the street, appropriate sediment controls will be in place before pouring begins. 12 PARK ROAD 1A / 357 – 359 Cleveland Street, Redfern, NSW, 2016 | PH +61 2 9699 2622 15 NOOSA HEADS [email protected] | www.mylesbaldwin.com | ABN 68 139 176 328
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Approved Plans OPW17/0561.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.