Council archive · source document
SUPERSEDED Approved Plans OPW17/0561
Plans and drawings: the text below has words only, no drawings.
The builder/site manager will ensure that all appropriate sediment controls are in place before the concrete pour starts. Any spillage that does occurred during the delivery procedure will be swept up before removing the sediment controls and concrete spillage will not be hosed into the stormwater system. Excess concrete will be returned back to the supplier’s depot. Chutes, barrels, wheelbarrows and other equipment will be rinsed in the site wash-down area. To minimise the amount of wash-down water generated, excess concrete will be scraped off equipment before it is washed. Water in the wash down area will be contained and recycled as required and not allowed to flow into the stormwater system. The chute contents will be washed into the sediment receptacle drum and sealed with a lid before leaving the site. The drum will be secured onto the main frame of the vehicle ready for transportation, and the drum will be secured with a bracket that is easily accessible to the operator. The drum will be removed from the bracket and the wastewater emptied into the designated treatment facility once the truck returns to the yard with the wastewater containing suspended solids being recycled back into the plant. The vehicle will be washed down at the depot. Delivery vehicles will be on paved surfaces at all times and so no mud soil and or stones will be carried off site as pollutants. An inspection of roads for any sediment that has been tracked off site will occur and if any is present it will be sweep back on site (this will be done if there is threat of rain and at the end of each day). A hose will not be used to wash it away). INSTALLATION OF PILES AND CAPPING Methodology for installation of hollow bar micro-piles as deep foundation support for the new timber deck. The micro-piles consist of one or more outer steel casings installed to the depths indicated on the piling subcontractor (PCA) drawings. A central steel-reinforcing element consisting of a 40/20 hollow bar is to extend to a pre-determined design depth below the casing to form the bond length and develop the applied load. After checking the project drawings for the details of the micro-pile arrangement for each pile location designed in accordance with the Tree Protection Plan, the Construction Management Plan, and relevant environmental protection documentation and instructions, the rig will be craned into position for the first pile onto a previously established level temporary protective platform constructed in accordance with the tree protection plan and AS4970 - 2009. Drilling will be carried out using a 90mm EXX drill bit using a rotary top hammer for installation and all installation specifications accurately recorded for this and all subsequent piles. The piles are grouted as the work proceeds and any excess grout is collected and pumped into storage containment for offsite disposal in accordance with the concreting operations environmental protection plan. The process is repeated for subsequent piles. The onsite grouting pump will be contained within its own bunded area which will be kept clean as the work proceeds and managed in accordance with the above Environmental Controls Plan to prevent pollution from concreting operations during the construction. Pile capping is to be managed in the same way as the grouting procedures. 12 PARK ROAD 1A / 357 – 359 Cleveland Street, Redfern, NSW, 2016 | PH +61 2 9699 2622 16 NOOSA HEADS [email protected] | www.mylesbaldwin.com | ABN 68 139 176 328
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Approved Plans OPW17/0561.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.