Skip to the record
For the highest quality transcripts.

Council archive · source document

RFI - Traffic Response Letter · MCU24/0153

of 17

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (14.4 MB): the original may take a few minutes to open or download. The page text below is quick to read.

provided by the manufacturer were overlaid on the plans which indicates the car stacker system envelope and
associated turn paths.

Relevant line marking will be done during Operational Works and detail design stages based on manufacturer
requirements as determined at that time. Details provided by the manufacturer outlining the external extents of
the car stackers were overlayed in Appendix B which indicates the likely external line marking outlines.

All drainage and stormwater features are referred to the civil engineering plans which will also be finalised during
Operational Works stages.


 3. Summary

In summary it was found that the proposed layout would be safe and functional and compliant with relevant
AS2890.1:2004 standards. The proposed development is not expected to have a significant impact on safety of
motorists or pedestrians or queueing related matters. The parking layout would also be compliant with
AS2890.1:2004 clearance and minimum turn movement requirements when entering / exiting these parking bays.

I trust that the above and attached are clear and assist council with their review. Should you have any questions,
please feel free to call me to discuss.




                                                                                     21/03/2025
Approved by:
                                                       Signed                                     Date


                                     Herman Joubert
                                     RPEQ No.: 25899




51 Elanda Street Traffic Response Letter                        21 March 2025                                      4

Used in these records

About this file

File size
14.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

RFI - Traffic Response Letter.pdf · 14.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.