Skip to the record
For the highest quality transcripts.

Original source · versioned page text

ADAMS+SPARKES Response to Information Request (Gympie Tce) 160401

Attached to the e-mail Response to Information Request - MCU16/0138.

of 41

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

    (c) Grades of all drainage lines including the lines that collect and covey surface water from the
        adjoining properties.

    Response;
    Refer to the attached photographs of information provided by council regards the location, size and
    levels of the stormwater drainage external to the site.

    (d) The discharge rates at the kerb & channel. Note that the maximum discharge rate at any one
        location is 25l/sec.

    Response;
    Refer to Draw Nos. OP2-A for flow rates from each of the pipe outlets discharging to the kerb.

Information Required 5

Certification

Based on the information provided above we confirm that the development of the site, if built in
accordance with the submitted design, will not cause any additional ponding of stormwater on the
adjoining properties up to and including the 1% AEP event.

Information Required 6

Provide plans that demonstrate that vehicles can access the site and all spaces in a forward gear, reverse
from the space and exit the site in a forward gear in a total of 3 movements.

Response;
Find attached JTC Draw Nos. HT477-SK10, SK11, SK12, SK13 indicating the turning circles using the
B99 vehicle.

Information Required 7

Amend or provide additional engineering plan to show the required works associated with removing the
existing redundant driveways and reinstating the kerb line and the road grassed verge area.

Response;
Find attached JTC Draw No. OP2-A with notes indicating the requirement to reinstate the kerb & channel
and the grassed verge.

I thank you for the opportunity to be of assistance to you on this occasion, should you have any further
queries with regard to the above please do not hesitate to contact our office.




Regards, .....                          ...................... John Titmus NPER – RPEQ 4092 Engineer.



         Civil & Structural  Design & Drafting  Residential  Commercial  Subdivisions
                                The JTC Consulting Engineers Trust trading as
                                JTC Consulting Engineers ABN 34 832 895 535
Log in to download the original file

ADAMS+SPARKES Response to Information Request (Gympie Tce) 160401.pdf · 12.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.