Original source · versioned page text
ADAMS+SPARKES Response to Information Request (Gympie Tce) 160401
Attached to the e-mail Response to Information Request - MCU16/0138.
The original of this document is very large (12.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
17-0022/T0070 2.4. MODELLED INFRASTRUCTURE The two inlet pits, connected by a 375mm diameter pipe, and the 450mm pipe at 0.3% grade into the canal have been modelled as part of this assessment. Refer to Figure 2 for further details. In addition, the proposed 450mm x 300mm RCBC has been included in the model. The area beside the proposed dwelling has been included, as has a section of Gympie Terrace. Refer to Figure 3 for further details. Figure 2 – Existing Drainage Infrastructure included in XPSWMM Environment. Engineering. Education Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.