Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

ADAMS+SPARKES Response to Information Request (Gympie Tce) 160401

Attached to the e-mail Response to Information Request - MCU16/0138.

of 41

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

17-0022/T0070




Figure 3 – Proposed Drainage Infrastructure included in XPSWMM

2.5.               MODEL RESULTS

The peak water level at the inlet pits in the Sea Scouts site has been assessed for each of the scenarios modelled.
Based on these results, the peak water level during the 100 year ARI scenario is:

      1.     Scenario 1 (free outlet) – peak water level = 1.43 m AHD
      2.     Scenario 2 (free outlet with 50% blockage of inlet pits) – peak water level = 1.47 m AHD
      3.     Scenario 3 (HAT) – peak water level = 1.69 m AHD


3               SUMMARY
The peak water level in the Sea Scout site has been assessed in the post-development scenario. Hydraulic
modelling indicates the peak water level will range between 1.43 m AHD and 1.69 m AHD during a 100 year ARI
event. During major flood events, the whole Sea Scout site will be inundated and the impact of the proposed
development will not have any adverse impact on the Sea Scouts property during such an event.

The proposed RCBC in the south-western corner of the development provides relief drainage for the Sea Scout
site. During the HAT scenario, runoff is conveyed from the Sea Scouts at a flow rate of 130L/s towards Gympie
Terrace.




Environment. Engineering. Education                                                                           Page 4
Log in to download the original file

ADAMS+SPARKES Response to Information Request (Gympie Tce) 160401.pdf · 12.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.