Original source · versioned page text
ADAMS+SPARKES Response to Information Request (Gympie Tce) 160401
Attached to the e-mail Response to Information Request - MCU16/0138.
The original of this document is very large (12.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
LEGEND
EXISTING SEWER
STORMWATER GRATED
PIT & PIPEWORK
STORMWATER FLOW
DIRECTION &
DRIVEWAY FALL
EXISTING WATER MAIN
EXISTING KERB
& CHANNEL
EXISTING OVERHEAD
POWER LINES
EXISTING SURFACE
CONTOURS
EXISTING TELSTRA LINE
No Date Amendment
APPROVED CLIENT: THE PROPERTY CLINIC
JTC CONSULTING ENGINEERS A 01-03-17 PIPE IL'S, DRIVEWAY GRATE & NOTES ADDED
Design:
Drawn:
B.Boyce
B.Boyce PROJECT: PROPOSED DUPLEX DEVELOPMENT
JOB NUMBER:
CONSULTING ENGINEERS R.P.E.Q. 4092 216133
P.O. BOX 5960, MAROOCHYDORE. QLD 4558 Date: 18/11/2016 AT: 111-113 GYMPIE TERRACE, NOOSAVILLE
HAYDN WATSON - RPEQ 6200 DRAWING No:
T: (07) 5443 6585 Fax: (07) 5479 1754
Checked: H.T. DATE: 18/11/2016 LOT 6 ON RP79817& LOT 18 ON RP66590
Email: jtcengineers.com.au [email protected]
Datum: A.H.D. SIZE A3 TITLE: EROSION & SEDIMENT CONTROL PLAN
OP3 - A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.