Original source · versioned page text
ADAMS+SPARKES Response to Information Request (Gympie Tce) 160401
Attached to the e-mail Response to Information Request - MCU16/0138.
The original of this document is very large (12.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
APPLICATION PERFORMANCE INDICATORS
OBJECTIVE:
DEFECTS LIABILITY PERIOD
Water Quality Parameter Release Criteria Criteria Type
TEMPORARY CONSTRUCTION ENTRY / EXIT
SEDIMENT TRAP
DESIGN REFERENCE:
ALTERNATIVE 2
MANAGEMENT OF ESCP
ON GRADE SEDIMENT TRAP
ELEVATION
SEDIMENT FENCE
ALTERNATIVE 1
NOTES
Optional rock apron
'U' shaped check dam
A PLAN
A
ELEVATION SECTION A-A
CHECK DAMS FLOW CONTROL
No Date Amendment
APPROVED CLIENT: THE PROPERTY CLINIC
JTC CONSULTING ENGINEERS Design:
Drawn:
B.Boyce
B.Boyce PROJECT: PROPOSED DUPLEX DEVELOPMENT
JOB NUMBER:
CONSULTING ENGINEERS R.P.E.Q. 4092 216133
P.O. BOX 5960, MAROOCHYDORE. QLD 4558 Date: 18/11/2016 AT: 111-113 GYMPIE TERRACE, NOOSAVILLE
HAYDN WATSON - RPEQ 6200 DRAWING No:
T: (07) 5443 6585 Fax: (07) 5479 1754
Checked: H.T. DATE: 18/11/2016 LOT 6 ON RP79817& LOT 18 ON RP66590
Email: jtcengineers.com.au [email protected]
Datum: A.H.D. SIZE A3 TITLE: EROSION & SEDIMENT CONTROL NOTES
OP4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.