Council archive · source document
20517 App I.pdf [As Published] · 132007.1259
DIVISION 18: TRANSPORT, ROADS AND DRAINAGE CODE Table 14-56 Roads and Drainage || $5.1 Road planning and design supports the hierarchy and functional aspects identified in Sections 2 and 3 of PSP5 Engineering Design Standards — Roads, Drainage and Earthworks; AND $5.2 Road and pathway planning and design is in accordance with, in order of precedence: (a) | (b) (c) Noosa Integrated —_Local Transport Plan; Queensland Transport's Shaping Up; Queensland Design Code for Residential Streets; AUSTROADS Guide to Traffic Engineering Practice; Sections 2 and 3 of PSPS 5 Engineering Design Standards - Roads, Drainage, Earthworks; or The Noosa Cycling and Walking Network Development Plan; or A combination of the principles in these documents. AND Operational Works design of roads and pedestrian/cycle paths will be in accordance with Sections 2 and 3 of PSP 5 Engineering Design Standards — Roads, Drainage and Earthworks. To be further addressed by traffic engineer.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App I.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.