Skip to the record
Search everything, all in one place.

Council archive · source document

20517 App I.pdf [As Published] · 132007.1259

of 33

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

$5.3 On road cycling treatment is
utilised to provide safe and
continuous movement of cyclist
along a roadway, such as:

| (a)
(b)
(c)

sealed shoulders;
wide kerbside lane;

exclusive or peak period
bicycle lane;

()

advisory treatments such as
Bicycle Awareness Zone;

shared parking/bicycle lane;
(f) contra flow bicycle lane; and
bus/bicycle lane.

 

 

 
  

$5.4 The provision of bicycle
| lanes at intersections is generally
in accordance with AUSTROADS
Part 14, Section 5 and the Manual

 

 

 

 

 

   
 

PSP 5 Engineering Design

Earthworks;
AND

planning, design and construction :
is in accordance with Section 4 of :

of Urban Traffic Devices
(MUTCD) Part 9. ,
$6.1 Stormwater drainage Stormwater drainage planning is

in accordance with Section 4 of
PSP 5 Engineering Design

. Standards — Roads, Drainage and
"| Standards — Roads, Drainage and |
: Urban Drainage Design Manual,
- as per the Stormwater

: Management plan prepared by

: Brown Consulting.

Earthworks and the Queensland

 

Used in these records

About this file

File size
5.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

20517 App I.pdf [As Published].pdf · 5.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.