Council archive · source document
20517 App I.pdf [As Published] · 132007.1259
$5.3 On road cycling treatment is utilised to provide safe and continuous movement of cyclist along a roadway, such as: | (a) (b) (c) sealed shoulders; wide kerbside lane; exclusive or peak period bicycle lane; () advisory treatments such as Bicycle Awareness Zone; shared parking/bicycle lane; (f) contra flow bicycle lane; and bus/bicycle lane. $5.4 The provision of bicycle | lanes at intersections is generally in accordance with AUSTROADS Part 14, Section 5 and the Manual PSP 5 Engineering Design Earthworks; AND planning, design and construction : is in accordance with Section 4 of : of Urban Traffic Devices (MUTCD) Part 9. , $6.1 Stormwater drainage Stormwater drainage planning is in accordance with Section 4 of PSP 5 Engineering Design . Standards — Roads, Drainage and "| Standards — Roads, Drainage and | : Urban Drainage Design Manual, - as per the Stormwater : Management plan prepared by : Brown Consulting. Earthworks and the Queensland
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App I.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.