Council archive · source document
20517 App I.pdf [As Published] · 132007.1259
-| located on $10.1 The location, design and construction of stormwater drainage __ structures is in f | accordance with Sections 4 and 5 =| of PSP5, Engineering Design -~| Standards ~ Roads, Drainage and Earthworks; | AND $10.2 Where infrastructure is private land an easement is dedicated over the infrastructure in accordance with | Section 4 of PSP5 Engineering Design Standards - Roads, Stormwater drainage planning, design and construction is/will be in accordance with Section 4 of PSP 5 Engineering Design Standards — Roads, Drainage and Earthworks, as per the Stormwater Management plan prepared by Brown Consulting and as per future Operational Works design. Where infrastructure is located in private property easements will be dedicated to Council as per Section 4 of PSP 5 Engineering Design Standards — Roads, Drainage and Earthworks. Drainage and Earthworks. —| AND $11.1 The following infrastructure components already existing at the frontage of the site or are provided at the developer's expense: | (a) full width sealed road; (b) concrete kerb and channel where appropriate; (c) forming and grading to footpaths; (d) vehicular kerb and footpath crossings; (e) aconstructed bikeway; (f) aconstructed footpath; (g) aconstructed carriageway; (h) required alterations to public utility mains, services or installations; (i) . construction of any required alterations to public utility | &) mains, services or installations; | G) stormwater drainage works; and installation of electrical conduits. ‘| $11.2 Road and drainage design and construction is in accordance with Sections 3 and 4 of PSP 5 Engineering Design Standards — Roads, Drainage and Earthworks. The frontage of the site is/will be provided with all required frontage works. Road and stormwater design and construction will be undertaken in accordance with Sections 3 and 4 of PSP 5 Engineering Design Standards — Roads, Drainage and Earthworks . and the Queensland Urban Drainage Design Manual, during the Operational Works Phase.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App I.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.