-| located on

$10.1 The location, design and
construction of stormwater
drainage __ structures is in
f | accordance with Sections 4 and 5
=| of PSP5, Engineering Design

-~| Standards ~ Roads, Drainage and

Earthworks;

| AND

$10.2 Where infrastructure is
private land an
easement is dedicated over the
infrastructure in accordance with
| Section 4 of PSP5 Engineering
Design Standards - Roads,

Stormwater drainage planning,
design and construction is/will be
in accordance with Section 4 of
PSP 5 Engineering Design
Standards — Roads, Drainage and
Earthworks, as per the
Stormwater Management plan
prepared by Brown Consulting
and as per future Operational
Works design.

Where infrastructure is located in
private property easements will be
dedicated to Council as per
Section 4 of PSP 5 Engineering
Design Standards — Roads,
Drainage and Earthworks.

 

Drainage and Earthworks.

 

 

—| AND

 

 

 

$11.1 The following infrastructure
components already existing at
the frontage of the site or are
provided at the developer's
expense:

| (a) full width sealed road;

(b) concrete kerb and channel

where appropriate;

(c) forming and grading to
footpaths;

(d) vehicular kerb and footpath
crossings;

(e) aconstructed bikeway;

(f) aconstructed footpath;

(g) aconstructed carriageway;

(h) required alterations to public
utility mains, services or
installations;

(i) . construction of any required
alterations to public utility

| &)

mains, services or
installations;

| G) stormwater drainage works;
and
installation of electrical
conduits.

‘| $11.2 Road and drainage design
and construction is in accordance
with Sections 3 and 4 of PSP 5
Engineering Design Standards —
Roads, Drainage and Earthworks.

 

The frontage of the site is/will be
provided with all required frontage
works. Road and stormwater
design and construction will be
undertaken in accordance with
Sections 3 and 4 of PSP 5
Engineering Design Standards —
Roads, Drainage and Earthworks .
and the Queensland Urban
Drainage Design Manual, during
the Operational Works Phase.

 

 

Used in these records

About this file

File size
5.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

20517 App I.pdf [As Published].pdf · 5.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.