Council archive · source document
20517 App I.pdf [As Published] · 132007.1259
DIVISION 21: WATER SUPPLY AND SEWERAGE RETICULATION CODE Table 14-59 Water Supply ‘| $1.1 Water supply infrastructure =| is designed in accordance with Section 3 of PSP 6 — Engineering Design Standards — Water and Sewerage and As Constructed data submitted in accordance with Section 7 of PSP 6 — Engineering Design Standards — Water and Sewerage. Water supply infrastructure will be designed in accordance with Section 3 of PSP 6 — Engineering Design Standards — Water and Sewerage during the Operational Works phase. As-constructed data for water supply infrastructure will be designed in accordance with Section 3 of PSP 6 — Engineering Design Standards — Water and Sewerage at the completion of construction. $2.1 Water supply infrastructure is constructed in accordance with Section 6 of PSP 6 — Engineering Design Standards — Water and Sewerage; AND $2.2 Erosion and.Sediment control measures are designed and implemented in accordance with the Institution of Engineers Australia (Qld Division) Soil Erosion and Sediment Control — Guidelines for Queensland Construction Sites. Water supply infrastructure will be constructed in accordance with Section 6 of PSP 6 - Engineering Design Standards — Water and Sewerage during the Operational Works phase. Erosion and sediment control measures will be implemented as per Drawing No. NO7046-02 by Brown Consulting. No solution provided. On and off maintenance inspections and testing of all assets to be dedicated to Council will be undertaken as per Council requirements prior to handover of assets. No solution provided. All required technical documentation associated with water supply infrastructure will be provided in the Operational Works submission. $5.1 The footing of any building _| or structure is located clear of the zone of influence but no closer -| than 1.5m (measured horizontally) from infrastructure including sewers, water mains and | stormwater structures. AND $5.2 A registered easement in favour of Council is created over all underground infrastructure located in private property; AND During Operational Works design the water supply infrastructure shall be positioned to ensure all buildings are located outside the zone of influence. An easement will be registered in Council’s favour for any water supply infrastructure located within private property as per Council's requirements.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App I.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.