Skip to the record
Noosa’s premier civic archive.

Council archive · source document

20517 App I.pdf [As Published] · 132007.1259

of 33

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

'| $5.3 The width of the easement
is the greater of 3m or the width of
the zone of influence;

AND
$5.4 The easement is centred

: over the centreline of the
infrastructure.

 

$6.1 Infrastructure is designed
and constructed on the preferred
alignments in accordance with
Section 3 of PSP 6 Engineering
Design Standards — Water and
Sewerage.

Water supply infrastructure will be
designed and constructed on
Council’s preferred alignment in
accordance with Section 3 of PSP
6 — Engineering Design Standards
— Water and Sewerage during the
Operational Works phase.

 

$7.1 Any alterations or repairs to
infrastructure as a result of the
development are completed at the
developer's expense.

All alterations/repair to existing
infrastructure associated with the
development of this site will be at
the developer's expense.

 

 

 

 

$1.1 Sewerage Reticulation
infrastructure is designed in
accordance with Sections 4 and 5
of PSP 6 — Engineering Design
Standards — Water and
Sewerage.

Sewerage reticulation
infrastructure will be designed in
accordance with Sections 4 and 5
of PSP 6 — Engineering Design
Standards — Water and Sewerage
during the Operational Works
phase.

 

 

 

$9.1 Sewerage Reticulation
infrastructure is constructed in
accordance with Section 6 of PSP
6 — Engineering Design Standards
— Water and Sewerage and As
Constructed data submitted in

-| accordance with Section 7 of PSP
6 — Engineering Design Standards
— Water and Sewerage;

AND

 

 

Sewerage infrastructure will be
constructed in accordance with
Section 6 of PSP 6 — Engineering
Design Standards — Water and
Sewerage during the Operational
Works phase.

As-constructed data for sewerage
supply infrastructure will be
designed in accordance with
Section 7 of PSP 6 — Engineering
Design Standards — Water and
Sewerage at the completion of
construction.

 

 

Used in these records

About this file

File size
5.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

20517 App I.pdf [As Published].pdf · 5.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.