Skip to the record
Every meeting, every word.

Council archive · source document

20517 App I.pdf [As Published] · 132007.1259

of 33

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

_| $9.2 Erosion and Sediment
control measures are designed
and implemented in accordance
with the Institution of Engineers
Australia (Qld Division) Soil
Erosion and Sediment Control —
Guidelines for Queensland
Construction Sites.

Erosion and sediment control
measures will be implemented as
per Drawing No. NO7046-02 by
Brown Consulting.

 

No solution provided.

On and off maintenance
inspections and testing of all
assets to be dedicated to Council
will be undertaken as per Council
requirements prior to handover of
assets.

 

No solution provided.

All required technical .
documentation associated with
sewerage reticulation
infrastructure will be provided in
the Operational Works
submission.

 

$12.1 The footing of any building
or structure is located clear of the
zone of influence but no closer
than 1.5m (measured horizontally)
from infrastructure including
sewers, water mains and
stormwater structures.

AND

$12.2 A registered easement in
favour of Council is created over
all underground infrastructure
located in private property;

AND

$12.3 The width of the easement
is the greater of 3m or the width of
the zone of influence;

AND

$12.4 The easement is centred
over the centreline of the
infrastructure.

During Operational Works design
the sewerage reticulation
infrastructure shall be positioned
to ensure all buildings are located
outside the zone of influence. An
easement will be registered in
Council's favour for any water
supply infrastructure located
within private property as per
Council's requirements.

 

$13.1 Infrastructure is
constructed on the preferred
alignments in accordance with
Section 4 of PSP 6 — Engineering
Design Standards — Water and
Sewerage.

Sewerage reticulation
infrastructure will be designed and
constructed on Council's preferred
alignment in accordance with
Section 4 of PSP 6 -— Engineering
Design Standards — Water and
Sewerage during the Operational
Works phase.

 

 

 

 

$14.1 Any alterations or repair to
infrastructure as a result of the
development are completed at the
developer's expense.

 

All alterations/repair to existing
infrastructure associated with the
development of this site will be at
the developer's expense.

 

 

Used in these records

About this file

File size
5.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

20517 App I.pdf [As Published].pdf · 5.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.