Original source · versioned page text
2022-09-15 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 15 SEPTEMBER 2022
be provided along the full length of the proposed pedestrian/cycleway.
Currency Period
13. This development approval lapses if the use has not happened by 15 September
2028 unless an application to extend the currency period is approved by Council.
Building Height
14. The maximum height of the development must not exceed RL118.15 8m to the
peak of the roof line. as detailed on section B-B of Plan SK04.
15. Certification must be submitted to Council from a Licensed Surveyor which certifies
that the building does not exceed the maximum height requirement of this Decision
Notice.
Performance Bond
16. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
must be submitted to Council, to secure performance of all conditions of this
approval, prior to the issue of a Development Permit for Operational Works. The
cash bond or trading bank guarantee will be returned on performance of the
conditions of approval less any costs incurred by Council in respect of enforcing
performance of this permit. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.
Street Identification
17. The street address of the development must be clearly visible and discernible from
the primary frontage of the site by the provision of a street number and, where
appropriate, the building name.
External Works – Wimmers Lane
18. Wimmers Lane must be upgraded for the length of its frontage to the subject site.
The works must be undertaken in accordance with an Operational Works approval
and must include in particular:
a. construction of kerb and channelling, road widening and underground
stormwater drainage to the development side only. The final extent and
alignment of works to be determined as part of the subsequent Operational
Works approval.
Road Widening of Wimmers Lane
19. The developer must dedicate as “road” a 2m wide strip extending across the full
frontage of the site to Wimmers Lane. The dedication must be in accordance with
drawing number Plan number SK01 Version G dated 23 August 2022 prepared by
Wiltshire Stevens Architecture.
20. The dedication must be completed prior to the commencement of the use.
External Works – Emerald Street
21. Emerald Street must be upgraded for the length of its frontage to the subject site.
The works must be undertaken in accordance with an Operational Works approval
and must include in particular:
a. a full width pathway extending from the property boundary to the kerb and
channel.
b. works to transition the new full width pathway to match smoothly with the
existing frontages of the adjoining properties. These works will extend
beyond the frontage of the subject site. The transitions must be constructed
at grades that are in accordance with Council’s Planning Scheme Policy 5 –
Engineering Design Standards – Roads, Drainage and Earthworks.
Page 11 of 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.