ORDINARY MEETING AGENDA 15 SEPTEMBER 2022
development to withstand the short-term erosion associated with a 500-year
average recurrence interval storm event combined with shoreline recession due to
sea-level rise for 2100 climate change. The short-term erosion associated with a
500-year average recurrence interval storm event combined with shoreline
recession due to sea-level rise for 2100 climate change to be considered for the
design as per the recommendations of the Royal Haskoing DHV report ‘Report 66
Seaview Terrace, Sunshine Beach Coastal Hazards Assessment, reference
PA2906-RHD-ZZ-XX-RP-Z-0001 dated 3 June 2022.
19. The footing system and erosion protection system must in accordance with the
works detailed in the Tectonic report “Geotechnical Investigation, Proposed
residence 66 Seaview Terrace, Sunshine Beach”, (Reference 21370-001-Rev 1
dated 28 April 2022) and other supporting documents referenced in the Tectonic
report.
20. The design must include the protection of the northern and southern boundaries of
the site to prevent erosion on neighbouring properties exposing the side
boundaries of the site to erosion. The minimum extent of the side boundary
protection must be determined by a line drawn at 28° extending upwards to the
west from the base of the rear point of the erosion as per the recommendations of
Tectonic report “Geotechnical Investigation, Proposed residence 66 Seaview
Terrace, Sunshine Beach”, reference 21370-001-Rev 1 dated 28 April 2022.
21. The design must be accompanied by certification by a Registered Professional
Engineer of Queensland (RPEQ) specialising in geotechnical engineering that the
design is satisfactory and will provide a long-term factor of safety concerning slope
stability of no less than 1.5.
22. Following construction, certification must be supplied to Council by an RPEQ
specialising in geotechnical engineering that the works have been constructed in
accordance with the approved design.
23. A dilapidation survey shall be carried out of all adjacent properties and structures
before the commencement of construction of the proposed development on the
site.
24. Due to the risk of instability on the existing dune slope and the potential for
settlement of loose sand on the adjacent properties, vibrations must be kept to a
minimum and must be monitored during the construction of the development.
Driven piles (both sheet piles and pile footings) are not permitted on the site.
25. Landscaping at the rear of the property and the crest of the existing dune slope
shall be limited to a maximum surcharge of 5kPa unless a site-specific slope
stability analysis is carried out to demonstrate that higher loads are acceptable.
26. Under no circumstances shall building materials be temporarily stockpiled in the
area of the crest of the existing dune slope or on the slope.
27. Discharge of concentrated stormwater flows onto the dune slope must be avoided,
and under no circumstances will subsurface disposal of water be permitted using
infiltration pits.
28. Stormwater runoff from gutters, down-pipes, driveways, and paved areas must be
collected and directed by pipes into the Council stormwater system along Seaview
Terrace.
29. The existing dune slope and any areas disturbed by the construction of the
proposed development shall be revegetated as soon as possible to reduce the
potential for erosion.
Earthworks
Page 16 of 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.