ORDINARY MEETING AGENDA 15 SEPTEMBER 2022
30. Earthworks required on-site must be carried out in accordance with Council’s
Planning Scheme Policy PSP6 Engineering Design Standards, so as not to cause
the additional ponding of water on any adjoining lands or concentrate or direct
overland flow on to an adjoining property.
31. All earthworks carried out on site must not affect the structural stability of the
adjoining lands and/or buildings and/or structures and/or services.
32. All earthworks and associated retaining structures/batters, both above and below
ground level, both temporary and permanent, must be wholly contained within the
subject site unless written permission from the respective landowner(s) is provided
to Council.
33. All earthworks must be undertaken in accordance with the provisions of Australian
Standard AS3798: Guidelines on Earthworks for Commercial and Residential
Developments.
Significant Weather Event
34. Should a significant weather event occur which results in substantial erosion within
the site, and undermines the structure and/or renders the Detached House
uninhabitable, the owner must
a. Immediately secure the perimeter of the property to prevent unauthorised
access and then undertake necessary works upon the land to make the
detached house safe and suitable for habitation in a timely manner.
i. Any work proposed must be designed to ensure that the work will not
cause adverse impacts on other lands or on coastal processes.
ii. Rock, concrete and like hard materials must not be used for the
construction of beach protection works.
iii. Any work proposed to be carried out must be undertaken in accordance
with Development Permit for Operational Works.
b. or remove the Detached House and all associated structures including the
footpath crossover and make the land safe at no cost to the Council.
Site Access and Driveways
35. A sealed access driveway must be provided from the existing formation in Seaview
Terrace to all parking and manoeuvring areas of the development. The works must
be undertaken in accordance with an Operational Works approval and must
include a driveway located generally in accordance with the approved plans.
Stormwater Drainage
36. Stormwater runoff from the development must be collected and disposed of in
accordance with the recommendations of the site specific geotechnical report.
Stormwater runoff from gutters, down-pipes, driveways, and paved areas must be
collected and directed to Council stormwater drainage system along Seaview
Terrace. The works must be undertaken in accordance with an Operational Works
approval.
37. Prior to the commencement of the use a certificate must be issued by an RPEQ
certifying that the stormwater drainage system has been constructed in
accordance with the conditions of this permit.
Easements
38. Unless otherwise agreed in writing by the relevant service provider, any public or
third party infrastructure located on the subject site must be placed within an
easement registered against the title of the property.
39. All easements must be designed in accordance with the planning scheme and
Page 17 of 25