ORDINARY MEETING AGENDA                                                   15 SEPTEMBER 2022


        30.   Earthworks required on-site must be carried out in accordance with Council’s
              Planning Scheme Policy PSP6 Engineering Design Standards, so as not to cause
              the additional ponding of water on any adjoining lands or concentrate or direct
              overland flow on to an adjoining property.
        31.   All earthworks carried out on site must not affect the structural stability of the
              adjoining lands and/or buildings and/or structures and/or services.
        32.   All earthworks and associated retaining structures/batters, both above and below
              ground level, both temporary and permanent, must be wholly contained within the
              subject site unless written permission from the respective landowner(s) is provided
              to Council.
        33.   All earthworks must be undertaken in accordance with the provisions of Australian
              Standard AS3798: Guidelines on Earthworks for Commercial and Residential
              Developments.
        Significant Weather Event
        34.   Should a significant weather event occur which results in substantial erosion within
              the site, and undermines the structure and/or renders the Detached House
              uninhabitable, the owner must
              a.   Immediately secure the perimeter of the property to prevent unauthorised
                   access and then undertake necessary works upon the land to make the
                   detached house safe and suitable for habitation in a timely manner.
                   i.     Any work proposed must be designed to ensure that the work will not
                          cause adverse impacts on other lands or on coastal processes.
                   ii.    Rock, concrete and like hard materials must not be used for the
                          construction of beach protection works.
                   iii.   Any work proposed to be carried out must be undertaken in accordance
                          with Development Permit for Operational Works.
              b.   or remove the Detached House and all associated structures including the
                   footpath crossover and make the land safe at no cost to the Council.
        Site Access and Driveways
        35.   A sealed access driveway must be provided from the existing formation in Seaview
              Terrace to all parking and manoeuvring areas of the development. The works must
              be undertaken in accordance with an Operational Works approval and must
              include a driveway located generally in accordance with the approved plans.
        Stormwater Drainage
        36.   Stormwater runoff from the development must be collected and disposed of in
              accordance with the recommendations of the site specific geotechnical report.
              Stormwater runoff from gutters, down-pipes, driveways, and paved areas must be
              collected and directed to Council stormwater drainage system along Seaview
              Terrace. The works must be undertaken in accordance with an Operational Works
              approval.
        37.   Prior to the commencement of the use a certificate must be issued by an RPEQ
              certifying that the stormwater drainage system has been constructed in
              accordance with the conditions of this permit.
        Easements
        38.   Unless otherwise agreed in writing by the relevant service provider, any public or
              third party infrastructure located on the subject site must be placed within an
              easement registered against the title of the property.
        39.   All easements must be designed in accordance with the planning scheme and

                                                                                   Page 17 of 25
Log in to download the original file

2022-09-15 Ordinary Meeting Agenda(PDF, 1MB).pdf · 1.1 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.