Original source · versioned page text
Planning Report IDAS Forms Cover letter, Owner's consent, Appendices 2- PLM minutes & 3 - Economic Needs - Email 1 of 4 MCU16/0153 & REC16/0041
MATERIAL CHANGE OF USE TO ESTABLISH MULTIPLE HOUSING & VISITOR ACCOMMODATION 215 DAVID LOW WAY, PEREGIAN BEACH 32 Natural Hazards Risk & Resilience o Flood Hazard Area Level 1 – Queensland Floodplain Assessment Overlay Local Government Flood Mapping Area o Bushfire Hazard Area Bushfire Prone Area Strategic Airports and Aviation Facilities o Obstacle Limitation Surface Biodiversity o Protected Area o Wildlife Habitat o Regulated Vegetation o High Ecological Significance Wetlands 106. In accordance with Part E – Interim development assessment requirements of the SPP, the provisions of the SPP applicable to the development are addressed in the below section. 4.3.1 State Interest – Water Quality 107. The proposed development is required to be assessed against the following interim development assessment requirements: Development: (1) avoids or otherwise minimises adverse impacts on the environmental values of receiving waters, arising from: (a) altered stormwater quality or flows, and (b) wastewater (other than contaminated stormwater and sewage), and (c) the creation or expansion of non‐tidal artificial waterways, and (2) by demonstrating it complies with the SPP code: Water quality (Appendix 3). 108. The provided Stormwater Management Plan prepared by Covey Associates Pty Ltd (Appendix 6) demonstrates that the proposal minimises adverse impacts on environmental values through minimising and treating stormwater flows in accordance with the requirements of the Noosa Plan as well as the SPP. Accordingly, no further assessment against this component of the SPP is required. 4.3.2 State Interest ‐ Natural Hazards, Risk and Resilience 109. The proposed development is required to be assessed against the following interim development assessment requirements: Development: (1) avoids natural hazard areas or mitigates the risks of the natural hazard to an acceptable or tolerable level, and (2) supports, and does not unduly burden, disaster management response or recovery capacity and capabilities, and (3) directly, indirectly and cumulatively avoids an increase in the severity of the natural hazard and the potential for damage on the site or to other properties, and (4) avoids risks to public safety and the environment from the location of hazardous materials and the release of these materials as a result of a natural hazard, and THOMCO (NO 2087) PTY LTD DECEMBER 2016
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.