Original source · versioned page text
Referenced Document - MCU12/0216
Quarry Rehabilitation
Lake Macdonald Drive, Lake Macdonald
© 2012 - TTM Consulting (SC) Pty Ltd Reference No: 12SCT0037
2. The Proposed Development
2.1 Description of Operation
The report investigates the proposed haulage route between the subject site and two quarries
near Cooroy. The intention of the haul route is to extract material from Westridge Quarry for the
rehabilitation (filling) of Neales Quarry and White Pit Quarry to the south of the subject site. For
the purposes of this assessment the haulage route includes the following:
Brickworks access from Lake Macdonald Drive;
1.4km section of Lake Macdonald Drive; and
White Pit Quarry access from Lake Macdonald Drive.
It is noted that access from Neales Quarry will be via the White Pit Quarry access.
It is anticipated that the proposed haulage would be undertaken over a 2 year operation, with the
proposed haulage route shown in Figure 2.1.
Westridge Quarry
Brickworks
Proposed
Haul Route
Neales
Quarry
White Pit
Quarry
Figure 2.1: Proposed Haul Route
Page | 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.