Referenced Document - MCU12/0216
Quarry Rehabilitation
Lake Macdonald Drive, Lake Macdonald
© 2012 - TTM Consulting (SC) Pty Ltd Reference No: 12SCT0037
2.2 Haulage Profile
TTM have been advised that the proposed rehabilitation of Neales Quarry and White Pit Quarry
will involve the extraction of up to 900,000 tonnes (0.90Mt) over a 2 year period. It is understood
that the haulage vehicle will be a truck and dog with a payload of 30 tonnes.
Over this period it is anticipated that up to 30,000 heavy vehicles will enter and exit the subject
site with an anticipated maximum of 50 heavy vehicles per day.
2.3 Access
The following access arrangements exist at the sending and receiving quarries:
Brickworks (Westridge Quarry) access description:
o 12m wide gravel access with standard driveway controls; and
o All turn movements allowed however practically only left-in and right-out
movements will occur.
White Pit Quarry (and Neales Quarry) access description:
o 5m wide gated gravel access with standard driveway controls; and
o All turn movements allowed.
Page | 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.