RENEWAL PROJECTS
Program Description Project Total
Bridges Whole of Shire - annual bridge inspection program $ 20,000
Bridges Noosaville - Noosa Parade Munna Point Bridge - construction stage 2 (assumes stage 1 commenced in 13/14) $ 1,401,000
Coastal, Canals and Waterways. Noosaville - Gympie Tce / Williams St bank stabilisation sheet piling $ 40,000
Coastal, Canals and Waterways. Sunshine Beach - beach access 35 replace timber deck $ 65,000
Coastal, Canals and Waterways. Teewah Beach - southern dunal restoration and stormwater outlet $ 20,000
Coastal, Canals and Waterways. Noosaville - Gympie Tce Foreshore replace marine timber revetment walls $ 80,000
Coastal, Canals and Waterways. Noosa Main Beach - Sand pumping pipe replacement program $ 50,000
Community Facilities Noosa Leisure Centre – design and detailed drawings, redesign reception area - CONSTRUCTION APPROX $45,000 $ 10,000
Community Facilities Lake Macdonald - Kookaburra Park public amenities $ 55,000
Community Facilities Mill Place Boiler House - stage 2 of emergency repairs to the flue $ 100,000
Community Facilities Noosa Aquatic Centre - replace pool cleaner $ 20,000
Community Facilities Noosa Leisure Centre - replace existing concertina door in creche $ 25,000
Community Facilities Noosa Library and Noosa Leisure Centre - address ongoing issues with plumbing (outside scope of NSC plumbing section) $ 40,000
Community Facilities Sunshine Beach Skate Park - replace existing sleeper retaining wall with block wall $ 22,500
Community Facilities Whole of Shire - all council community facilities light pole testing $ 155,000
Community Facilities Whole of Shire - public toilet / sewerage pump stations renewal program $ 35,000
Community Facilities Cooroy Butter Factory - condition assessment $ 5,000
Community Facilities Noosa Leisure Centre -upstairs flooring to accommodate table tennis $ 60,000
Community Facilities Noosa Regional Gallery - access and disability compliance upgrade - amenities, entrance, reception $ 45,000
Community Facilities Noosa Respite Centre - internal refurbishment $ 150,000
Corporate Buildings Tewantin Council Office - roof rehabilitation $ 30,000
Environmental Assets, Bushland, Tracks and Trails Cudgerie - Cedar Gully Park water feature, dam project $ 22,000
Environmental Assets, Bushland, Tracks and Trails Noosa Trail Network 4 - bridge refurbishment $ 40,000
Environmental Assets, Bushland, Tracks and Trails Noosa Trail Network 4 - Ringtail Creek crossing $ 7,000
Environmental Assets, Bushland, Tracks and Trails Weyba Creek - bank erosion restoration and formalise public access $ 220,000
Fleet - Plant Replacement Whole of Shire - replacement of council's fleet $ 1,735,000
Gravel Road Network Whole of Shire - gravel resheeting - annual program $ 410,000
Holiday Parks Boreen Point Campground - wastewater treatment plant upgrade $ 60,000
Holiday Parks Noosa River Holiday Park - Internal refurbish small amenity $ 75,000
Parks & Playgrounds Noosa Botanical Gardens - Pathway renewal $ 10,000
Parks & Playgrounds Noosaville - Munna Park basket ball court $ 6,000
Parks & Playgrounds Noosaville -Gympie Tce Foreshore BBQs $ 55,000
Parks & Playgrounds Noosaville Lions Park - Pirate Playground all-abilities playground $ 100,000
Parks & Playgrounds Peregian Beach - Victory Park, park table $ 3,000
Parks & Playgrounds Peregian Beach Park - 3 phase switchboard $ 12,000
Parks & Playgrounds Tewantin - Martin Park skate facility $ 60,000
Parks & Playgrounds Whole of Shire - BBQ renewal $ 18,000
Parks & Playgrounds Whole of Shire - park shelters $ 40,000
Parks & Playgrounds Whole of Shire - playground renewal program $ 20,000
Parks & Playgrounds Whole of Shire - playground softfall $ 10,000
Pathways & Enabling Facilities Tewantin - pathway upgrade and lighting around Gallery and Tewantin Admin Building $ 270,000
Pathways & Enabling Facilities Noosa Heads - Park Road boardwalk design - Stage 3 (Little Cove east to top of hill) $ 200,000
Pathways & Enabling Facilities Noosa Heads - Main Beach boardwalk construction - Surf Club to Park Rd $ 500,000
Pathways & Enabling Facilities Noosa Heads - Park Road boardwalk stage 3a construction (Top of Hill to National Park) $ 850,000
2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.