2014-06-26 Budget Meeting Attachment F

of 4

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

RENEWAL PROJECTS
Program                                   Description                                                                                                                                        Project Total
Public Transport Infrastructure           Noosa Heads - Noosa Parade Stop 114 (NSC Ref), Eastbound Type S shelter, near Nancy Cato Park - Bus Shelter Disabled Compliant Program             $              50,000
Public Transport Infrastructure           Noosa Heads - Noosa Parade Stop 26 (NSC Ref), westbound Type S shelter, near Quamby Place - Bus Shelter Disabled Compliant Program                 $              40,000
Public Transport Infrastructure           Noosa Heads - Noosa Parade Stop 27 (NSC Ref), eastbound lattice shelter, near Quamby Place - Bus Shelter Disabled Compliant Program                $              40,000
Public Transport Infrastructure           Noosa Heads - Noosa Parade Stop 28 (NSC Ref), westbound Type S, near Nancy Cato Park - Bus Shelter Disabled Compliant Program:                     $              65,000
Public Transport Infrastructure           Noosa Junction Transit Centre - improve weather protection                                                                                         $              40,000
Public Transport Infrastructure           Peregian Beach - David Low Way Stop 87 (NSC Ref), northbound lattice shelter, opposite Glen Eden Resort - Bus Shelter Disabled Compliant Program   $             125,000
Public Transport Infrastructure           Sunrise Beach - Wollomia Way near Victory Cres, Stop 11 (NSC ref). Existing lattice Shelter - Bus Shelter Disabled Compliant Program               $              40,000
Public Transport Infrastructure           Whole of Shire - bus shelter DDA compliance audit                                                                                                  $              20,000
Sealed Road Network                       Whole of Shire - pavement surveys, investigations & SMEC Bureau Service                                                                            $              60,000
Sealed Road Network                       Whole of Shire - reseal and rehabilitation program                                                                                                 $           5,000,000
Sports Grounds & Facilities               Noosa Heads - Girraween Sports Ground irrigation upgrade                                                                                           $              28,000
Stormwater Drainage                       Noosaville - Gympie Terrace pipe rehabilitation stage 1                                                                                            $             200,000
Stormwater Drainage                       Sunshine Beach - re-lining of Ben Lexcen Drive stormwater drains stage 1                                                                           $              50,000
Stormwater Drainage                       Whole of Shire - stormwater proactive CCTV investigation                                                                                           $              10,000
Stormwater Drainage                       Whole of Shire - stormwater structures (non-pipe) incl. bike safe grates                                                                           $             150,000
Streescapes and Road Corridor             Noosa Heads - Noosa Parade Master Plan, between Lions Park and Maze Carpark                                                                        $             100,000
Streescapes and Road Corridor             Noosaville - Eumundi Noosa Road corridor improvements                                                                                              $              20,000
Transport and Infrastructure Management   Whole of Shire - On Road Cycle Network improvements                                                                                                $             125,000
Transport and Infrastructure Management   Sunrise Beach - Ben Lexcen Drive school crossing improvement design                                                                                $              70,000
Sealed Road Network                       Emergent all infrastructure renewal capital works                                                                                                  $           2,951,898
                                                                                                                                                                                                        $16,336,398




                                                                                                                                                                                                   3
Log in to download the original file

2014-06-26 Budget Meeting Attachment F(PDF, 1MB).pdf · 1.4 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.