RENEWAL PROJECTS
Program Description Project Total
Public Transport Infrastructure Noosa Heads - Noosa Parade Stop 114 (NSC Ref), Eastbound Type S shelter, near Nancy Cato Park - Bus Shelter Disabled Compliant Program $ 50,000
Public Transport Infrastructure Noosa Heads - Noosa Parade Stop 26 (NSC Ref), westbound Type S shelter, near Quamby Place - Bus Shelter Disabled Compliant Program $ 40,000
Public Transport Infrastructure Noosa Heads - Noosa Parade Stop 27 (NSC Ref), eastbound lattice shelter, near Quamby Place - Bus Shelter Disabled Compliant Program $ 40,000
Public Transport Infrastructure Noosa Heads - Noosa Parade Stop 28 (NSC Ref), westbound Type S, near Nancy Cato Park - Bus Shelter Disabled Compliant Program: $ 65,000
Public Transport Infrastructure Noosa Junction Transit Centre - improve weather protection $ 40,000
Public Transport Infrastructure Peregian Beach - David Low Way Stop 87 (NSC Ref), northbound lattice shelter, opposite Glen Eden Resort - Bus Shelter Disabled Compliant Program $ 125,000
Public Transport Infrastructure Sunrise Beach - Wollomia Way near Victory Cres, Stop 11 (NSC ref). Existing lattice Shelter - Bus Shelter Disabled Compliant Program $ 40,000
Public Transport Infrastructure Whole of Shire - bus shelter DDA compliance audit $ 20,000
Sealed Road Network Whole of Shire - pavement surveys, investigations & SMEC Bureau Service $ 60,000
Sealed Road Network Whole of Shire - reseal and rehabilitation program $ 5,000,000
Sports Grounds & Facilities Noosa Heads - Girraween Sports Ground irrigation upgrade $ 28,000
Stormwater Drainage Noosaville - Gympie Terrace pipe rehabilitation stage 1 $ 200,000
Stormwater Drainage Sunshine Beach - re-lining of Ben Lexcen Drive stormwater drains stage 1 $ 50,000
Stormwater Drainage Whole of Shire - stormwater proactive CCTV investigation $ 10,000
Stormwater Drainage Whole of Shire - stormwater structures (non-pipe) incl. bike safe grates $ 150,000
Streescapes and Road Corridor Noosa Heads - Noosa Parade Master Plan, between Lions Park and Maze Carpark $ 100,000
Streescapes and Road Corridor Noosaville - Eumundi Noosa Road corridor improvements $ 20,000
Transport and Infrastructure Management Whole of Shire - On Road Cycle Network improvements $ 125,000
Transport and Infrastructure Management Sunrise Beach - Ben Lexcen Drive school crossing improvement design $ 70,000
Sealed Road Network Emergent all infrastructure renewal capital works $ 2,951,898
$16,336,398