Minor Change Existing Approval - 132007.2399.03 (AS PUBLISHED)
Vegetation Protection & Preservation
70. All Class 1, Class 2 and Class 3 pest plants declared under the Land Protection (Pest and
Stock Route Management) Act 2002 are to be controlled on the site prior to Council
endorsement of the plan of survey. In this context “controlled” shall mean, for class 1 and 2
pests, completely eradicated. For class 3 pests it shall mean removal of the plants where
they threaten environmentally significant areas of the site such as riparian zones and areas
of natural vegetation. Where class 3 plants are removed as a result of this condition and
there is not sufficient natural regeneration of native species, the areas shall be replanted with
endemic native species so that a sustainable natural ecosystem is restored.
Council’s Conservation Management Supervisor will not inspect the site until 30 days after
the weed treatment and replanting is complete.
71. Vehicular pavements within the drip zone of any of the existing trees on site to be retained
shall be designed as a pervious pavement (such as grass paving cells or similar), as this will
allow water that falls on this surface to penetrate to the trees root system. The pavement
shall be constructed so as not to damage the tree or their root system and in this regard
temporary fencing shall be provided around the trees during construction to help protect
them.
Plans shall be submitted to the Council for approval that clearly show the type and extent of
the pervious pavement and the temporary fencing prior to obtaining a Development Permit
for Operational Works.
72. Where retained tress are located in areas proposed to filled on site (or are located on
neighbouring allotments to the actual site to be filled), there will be a need to prevent fill
material from being placed on the trees root system. To this end the design of the filling
works will need to incorporate terracing around the tree or a similar means of ensuring that
the natural ground level around the trees remains generally the same as existing. These
measures shall clearly be shown on the plans submitted for Operational Works approval and
any drainage required to drain these areas shall also be shown on the plans.
Contributions Towards Council Infrastructure
73. Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
upgrading various infrastructure at the rates applicable at the time of payment. An estimate
only of the contribution amounts under the current Council policies and requirements is
outlined in the table below:
Amount:
Contribution Required For:
Stage 1 Stage 2 TOTAL
PSP12 – Public Open Space Contributions (Park) - - -
PSP16 – Sewerage Headworks Contributions $1,318 $34,270 $35,588
PSP17 – Water Supply Headworks Contributions $4,892 $127,204 $132,096
PSP20 – Pathway Trunk Network Contributions $703 $18,271 $18,974
TOTAL Contribution Amount = $ 6,913 $179,745 $ 186,658
Please note, that these amounts are all subject to variations in the Consumer Price Index, All Groups
Brisbane from JUNE 2008 until the date of payment.
All contributions must be paid prior to Council endorsement of the plan of survey.
Page 11 of 19
Document Set ID: 24764739
Version: 6, Version Date: 18/05/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - 132007.2399.03 (AS PUBLISHED).pdfRelated documentApplication case desk ↗
About this file
- File size
- 216 KB (small file)
- File type
No other editions are linked here.