                      77.     The requirements of ENERGEX shall be satisfied in relation to any existing
                              services traversing the site. Written confirmation by ENERGEX that satisfactory
                              arrangements have been made to formalise any required easements and/or
                              existing informal services shall be submitted prior to Council endorsing the Plan of
                              Survey.
                      78.     Streets lighting and pathways lighting throughout the development site must be
                              provided in accordance with Australian Standards.
                      79.     Street lighting shall be provided along Pearsons Road frontage of the site in
                              accordance with Australian standards.
                      Telecommunication
                      80.     The requirements for TELECOMMUNICATION services shall be satisfied in
                              relation to the provision of new telephone services to the developed site. In this
                              regard written confirmation from an approved telecommunication agency shall be
                              submitted to the Council prior to Council endorsing the Plan of Survey.
                      Erosion and Sediment Control
                      81.     Any person acting on this permit shall prevent erosion and sediment export from
                              leaving the site. Site control measures such as silt fencing, controlled gravel
                              access to the site and controlled disposal of waste, will be necessary.
                              In this regard plans detailing the methods of controlling erosion and sediment are
                              required to be submitted to the Council for approval prior to obtaining a
                              Development Permit for Operational Works.
                      General
                      82.     A suitably qualified Registered Professional Engineer shall prepare engineering
                              drawings and specifications for all engineering works that will become Council
                              infrastructure, which shall be submitted in conjunction with an application for a
                              Development Permit for Operational Works. In this regard a DXF/DWG file on
                              GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in
                              conjunction with any application for Operational Works.
                      83.     Digital detailed designs including drawings, calculations, specifications and a
                              schedule of works, shall be submitted with any application for a Development
                              Permit for Operational Works in respect of roadworks and stormwater drainage
                              works. The design shall be in accordance with Council’s Planning Scheme Policy
                              PSP05 – Engineering Design Standards – Roads, Drainage and Earthworks. To
                              avoid conflict with underground pipes or services, all existing and proposed
                              services required by the development shall be shown on the plans.
                      84.     To facilitate production of As Constructed drawings it is suggested that all design
                              drawings are submitted in the Asset Design and As Constructed (ADAC) digital
                              format. (Guidelines on the use of ADAC are available at www.adac.com.au).
                      85.     A construction management plan/strategy shall be prepared by a suitably qualified
                              Registered Professional Engineer and submitted to Council in conjunction with any
                              application for Operational Works. The construction management plan shall ensure
                              no damage occurs to Council services and that any adverse impact on the local
                              area due to the construction works is within the acceptable limit and properly
                              managed to the satisfaction of Council.




                                                                                                        Page 12 of 37


Document Set ID: 20103451
Version: 1, Version Date: 25/07/2016                                                                 Print Date: 25 July 2016, 3:34 PM

Used in these records

About this file

File size
8.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment C - Current DA MCU15.0111.pdf · 8.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.