                      86.     A Traffic Management Plan for the each separate demolition and construction
                              phase of the development shall be submitted to and approved by Council at least 5
                              working days prior to the commencement of any Demolition or Building works or at
                              least 5 working days prior to the pre-start meeting for Operational Works. The
                              Traffic Management Plan shall include but not be limited to:
                              86.1. Mitigate any adverse impact and disturbance on the local residential area
                                    and on the traffic in the local and main roads to acceptable limits
                              86.2. Mitigate dust disturbance caused by vehicles and machinery movements
                              86.3. Limit the routes for the heavy vehicles to the major road network and limit the
                                    use of the local roads within residential area as access to the site
                              86.4. Indicate provision for on-site and off-site parking for the required workforce
                              86.5. Indicate the location of loading and unloading areas
                              86.6. Indicate the location of any “holding” areas for heavy vehicles
                              86.7. Operating hours.
                              Note - the Elm Street frontage of site shall not be used for access, parking or
                              loading and unloading during construction (and post construction) phase unless a
                              specific written permit obtained from the Department of Main Roads.
                      87.     Any damage caused to any public utility during the course of construction shall be
                              repaired to Council’s standards and at no cost to Council.
                      88.     Any alteration of any public utility or other facilities necessitated by the
                              development of the land or associated construction works external to the site shall
                              be at no cost to Council.
                      89.     The transportation of all materials to and from the site shall be undertaken in a
                              manner such that no particle matter escapes onto a public road. All vehicles
                              carrying materials either to or from the site shall be covered to prevent materials
                              including dust being windblown from the vehicle.
                      90.     As Constructed drawings and data shall be certified by a qualified experienced
                              Civil Engineer for design intent, and a Licensed Surveyor shall certify the cadastre
                              and the location, level and type of all services and structures. All of which shall be
                              submitted to Council for checking and for Council’s records.
                              The data must fully detail levels for all engineering works including but not limited
                              to roadworks, pathway, sewer main, water supply main, finished ground levels and
                              pavement surface levels and drainage structures that will become Council asset.
                              The data shall be submitted in the Asset Design and As Constructed (ADAC)
                              digital format.     (Guidelines on the use of ADAC are available at
                              www.adac.com.au).
                              Approval of works shall not be granted until all As Constructed information has
                              been supplied and accepted by Council.
                      Waste Management
                      91.     A Waste Management Plan (construction and demolition) shall be submitted prior
                              to demolition, removal or relocation of any building other than a shed. Waste
                              Management Plan (construction and demolition) is also required for construction of
                              15 or more dwelling units or for any business use of greater than 500m².




                                                                                                           Page 13 of 37


Document Set ID: 20103451
Version: 1, Version Date: 25/07/2016                                                                    Print Date: 25 July 2016, 3:34 PM

Used in these records

About this file

File size
8.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment C - Current DA MCU15.0111.pdf · 8.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.