Council archive · source document
Attachment C - Current DA MCU15.0111 · MCU15/0111.03
Noosa Council documents
MCU15/0111
Reconfiguring a Lot Conditions for 4 Lots into 3 Lots – REC15/0031
When Conditions Must Be Complied With
1. Unless otherwise stated, all works required by these conditions must be completed
prior to submission of the subdivision plan to Council for compliance assessment.
Approved Plan
2. Development, including staging of the development, shall be undertaken in
accordance with this approval and must generally comply with the approved plans
of development. The approved plans are titled and numbered:
Plan Title Drawing Reference Revision Date Prepared by
Plan of Proposed CO-ROL-2015 A 11/09/2015 Palm Lake Works
Reconfiguration
and as may be amended by these conditions.
Lot Amalgamation and Road Dedication
3. The Plan of Survey must include any road reserve dedications for any necessary
road widening for the proposed roadworks, electrical transformers and truncation
at the intersection of Pearsons Road with Elm Street to ensure the existing power
lines crossing this corner of the site are located within road reserve. The new
boundary line setback from the power line shall be in accordance with ENERGEX’s
requirements and adequate to accommodate any proposed or future roadworks
and pathway at this corner of the site.
4. Pursuant to s342 of the Sustainable Planning Act 2009, the Development Permit
for Reconfiguring a Lot lapses if the subdivision plan has not been registered by
the relevant titles authority commenced by 21 July 2020.
5 REFERRAL AGENCIES
The referral agencies applicable to this application are:
Referral Referral Agency and Referral Trigger Response
Status Address
Concurrence SARA at DSDIP Mike State Controlled The agency provided
Ahern Government Roads & Transport its response on 15
Building 12 First Infrastructure April 2016. A copy of
Avenue Maroochydore the response is
Qlld 4558 attached.
6 ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not
form part of the assessment manager conditions:
Infrastructure Charges
1. This Development Permit will trigger an “Infrastructure Charge Notice” to be issued
in accordance with Council’s “Charges Resolution” made pursuant to the
Sustainable Planning Act 2009 and in conjunction with the State Planning
Regulatory Provision (Adopted Charges).
Page 16 of 37
Document Set ID: 20103451
Version: 1, Version Date: 25/07/2016 Print Date: 25 July 2016, 3:34 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment C - Current DA MCU15.0111.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.