Council archive · source document
Decision Notice - 010.2008.00000658.001 [As Published] · 142008.658
Officer: Mark Lewis
Direct Telephone: (07) 5449 5263
Response Address: PO Box 141, Tewantin QLD 4565
Email: [email protected]
Our Reference: 2008/658
Your Reference:
8 July 2008
Gateway Rise Pty Ltd
CARE Tod Consulting Pty Ltd
20 Mary Street
NOOSAVILLE QLD 4565
Dear Sir/Madam,
Decision Notice
Integrated Planning Act 1997
I refer to your application and advise that on 8 July 2008 Council decided to approve the application
in full subject to conditions.
Details of the decision are as follows:
1 APPLICATION DETAILS
Application No: 2008/658
Street address: 184 Eumundi Noosa Road NOOSAVILLE, 178-182 Eumundi
Noosa Road NOOSAVILLE, Gateway Drive NOOSAVILLE
Real property description: LOT: 1 RP: 133192, LOT: 21 RP: 867627, LOT: 14 SP: 170295
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
The following type of approval has been issued:
Development Permit for Operational Works - Road & Drainage, Stormwater, Water &
Sewerage
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
4 ASSESSMENT MANAGER CONDITIONS
1. The development shall be carried out in accordance with the approved plans listed below or as
modified herein.
2. Bikeway/footpaths shall be constructed where shown on the approved plans. The
bikeway/footpaths shall have a slip resistant surface. The expansion joints in any
bikeway/footpath shall be “saw cut”, not trowel jointed.
3. The total required pavement thickness shall be based on the Department of Main Roads’
Pavement Design Manual using soaked CBR tests of the subgrade.
Page 1 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 9 pages
Page 2
2008/658
The design pavement thickness, together with CBR test results shall be submitted to Council’s
Manager, Land Development for approval prior to placement of pavement material.
4. Council’s Construction Technical Officer (ph 0410 512 505) shall be given seven (7) days’
notice of intention to commence works to arrange a “pre start” meeting prior to the
commencement of works.
5. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any sub contractors also have the appropriate insurance and public liability
documentation.
6. Prior to the “pre start” meeting, the principal contractor must be provided with a copy
of Council’s signed approved drawings and conditions by the applicant.
7. The Consulting Engineers for the project shall be currently Registered Professional Engineers
of Queensland (RPEQ). The consulting engineers are responsible for arranging all
inspections with Council’s Construction Technical Officer or nominated staff. Council’s
Construction Technical Officer shall provide an inspection form for signing off by the Engineer
at appropriate stages of construction, during on-site meetings. Construction Technical Officer
will also sign the form at each stage when requested conditions have been satisfied. The
works will be accepted “On Maintenance” after this form, signed by the inspector for each
stage is complete, together with a letter from the Engineer requesting that the works go “On
Maintenance”.
8. Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
project. (This person will be the contact for the project).
9. An inspection is to be carried out with the relevant Council officers, the Contractor and
Supervising Engineer after road centrelines have been established. This inspection is to deal
with the limits of clearing to be carried out for this development. This meeting is to take place
prior to the “Pre-start” meeting.
10. Council standards shall apply to these works unless otherwise modified herein.
11. The person acting on this permit shall ensure that its consultants and contractors take all
reasonable care during the construction of the engineering works to ensure that Council
property, road pavements or facilities (such as underground drainage, water supply,
sewerage, footpaths, kerbing, landscaping, street furniture, etc) are protected against any
damage or interference whatsoever.
If any Council property or facilities should be damaged by the Applicant or any of its
Consultants or Contractors through any cause whatsoever in the course of, directly or
indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
forthwith notify the Manager Land Development and shall forthwith rectify the damage to that
property or facility at its cost and to the satisfaction of the Manager Land Development.
All rectification works are to be completed prior to the sealing of the survey plan or,
alternatively, the Applicant may request Council to carry out the rectification work at the
Applicant’s cost, such cost being paid by the Applicant to Council prior to the sealing of the
survey plan.
In the case of any emergency, Council shall be entitled to rectify such damage at the cost of
the Applicant, such cost being paid prior to the sealing of the survey plan.
12. The development of the site shall be carried out in such a manner as to prevent dust and/or
sand nuisance to residents and/or tenants in the vicinity of the development.
13. Construction work and other associated activities are permitted only during the hours of 7.00
am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays,
except where extended hours are approved by the Manager, Land Development, or his
nominee.
Page 2 of 10
Page 3
2008/658
14. All signage, including that for safety during construction, shall be in accordance with the
Manual of Uniform Traffic Control Devices and Transport Infrastructure (Roads) Act.
15. If footpath / road closures are necessary to carry out construction works, Council’s
Construction Technical Officer (ph 0410 512 505) must be notified prior to the proposed
closure.
16. Sediment and erosion control measures must be in place prior to works commencing. If such
measures are not in place or are not satisfactory, “on the spot “ fines may be issued. Such
fines can be issued if sediments from the site are found to enter or have the potential to enter
Council’s stormwater system or natural waterways. Although the sediment and erosion control
measures have been approved on drawing 06583/SE1/T3 and drawing 06583/SE2/P1, being
part of Development Permit 2007/1625, Council’s Manager, Land Development, may request
further controls to be installed should approved measures be inefficient.
17. All stormwater drainage lines including private drainage lines (also known as inter-allotment
drainage lines) or as otherwise approved by Council’s Manager of Land Development shall be
inspected by closed circuit television (CCTV) at the completion of all works and immediately
prior to acceptance ‘On Maintenance’. Council’s Construction Technical Officer shall be
advised of the timing of this inspection.
A report of the CCTV inspection, including photographic records (which includes photos &
video recordings burnt onto a CD) of the inspection shall be submitted to the Council for
approval. Any defects or substandard works shall be recorded and accurately illustrated on
the drainage plan showing the location of the defect(s).
Substandard work will not be accepted ‘On Maintenance’ and must be rectified at the
applicants expense with a further CCTV inspection arranged once the rectification works have
been completed.
To this extent all CCTV inspections, including any additional inspections necessary following
defect identification and rectification, shall be entirely at the applicant’s expense. Any costs
incurred by Council in reviewing the CCTV inspection results shall also be borne by the
applicant.
18. Prior to acceptance of civil works to become Council assets "On Maintenance", the lodgement
of satisfactory “As Constructed” records shall be submitted to Council.
As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
(RPEQ) for design intent, and a Licensed Surveyor shall certify the cadastre and the location,
level and type of all services and structures. All of which shall be submitted to Council for
checking and for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage
structures, finished ground levels and pavement surface levels. The data shall be submitted in
the Asset Design and As Constructed (ADAC) digital format. Guidelines on the use of ADAC
are available at www.adac.com.au and Council’s “Noosa Planning Scheme Policy 5 –
Engineering Design Standards – Roads, Drainage and Earthworks”.
Approval of works shall not be granted until all As Constructed information has been supplied
and accepted by Council.
19. A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will
be imposed on construction works during the maintenance period, which is a minimum period
of 12 months duration. Such bond must be lodged by, and shall only be accepted from the
Developer for the works.
20. The works to become Council assets will not be accepted "On Maintenance" until the
landscaping is completed.
21. These works are also to be in compliance with the relevant conditions of Development Permit
No. 2007/1626.
Page 3 of 10
Page 4
2008/658
22. Notwithstanding that Council has checked the plans with due care, where it is found during
construction that variations from Council's standards exist, then Council standards shall apply.
23. WATER SUPPLY and SEWERAGE INFRASTRUCTURE APPROVAL CONDITIONS
This Decision Notice is issued subject to and conditional upon the relevant Approved
Development Permit having been granted to the applicant.
1. A copy of the job specification is to be provided to Council’s Inspector within seven (7) days of the
date of this Decision Notice, and prior to commencement of works.
2. The names of any proposed contractors for works are to be submitted in writing, together with
copies of current Public Liability and Workers Compensation Insurances together with certificates
of currency for those policies, for consideration by the Assessment Manager seven (7) days prior
to pre-start meetings and commencement of works.
A separate letter will then be issued approving the contractor (or otherwise) for the works. No
other contractor or subcontractor shall be engaged to carry out the works or any part of the works
without the written approval of the Assessment Manager.
3. Council’s Water & Sewerage Inspector shall be given (7) days notice of intention to commence
works. A pre-start meeting shall be arranged prior to commencement of works by contacting
Council’s Water & Sewerage Inspector, Mr Trevor Mourilyan, Ph. 0417 780 830. Inspector is only
available for pre-start meetings, inspections and testing etc. between the hours of 6:30am to
4:00pm, Monday to Friday. Inspector will not be available outside these hours unless prior
approval is obtained from the Water & Sewerage Capital Works Manager with any costs incurred
by Council outside the hours nominated above, met by the Contractor/Developer. These costs
will be in addition to normal inspection fees.
4. Notwithstanding that Council has checked the plans with due care, where it is found during
construction that variations exist with Council's standards, Council standards shall apply.
5. It is the responsibility of the applicant to ensure that its consultants and contractors take all
reasonable care during the construction of the engineering works to ensure that Council property
or facilities (such as underground drainage, water supply and sewerage) are protected against
any damage or interference whatsoever.
6.
If any Council property or facilities should be damaged by the applicant or any of its consultants or
contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
engineering works, the applicant and/or its contractors shall forthwith notify the Assessment
Manager and shall forthwith rectify the damage to that property or facility at its cost to the
satisfaction of the Assessment Manager prior to the sealing of the survey plan and/or acceptance
of the works on-maintenance. Alternatively, the applicant may request the Council to carry out
the rectification work at the applicant's cost, such cost being paid by the applicant to the Council
prior to the sealing of the survey plan and/or acceptance of the works 'on maintenance' provided
that in the case of emergency, the Council shall be entitled to rectify such damage at the cost of
the applicant such cost being paid prior to the sealing of the survey plan and/or acceptance of the
work 'on maintenance'.
7. The Contractor shall make all necessary arrangements for supply of water required for
construction works. The use of hydrant standpipes on Council mains will NOT be permitted.
Contractors should contact Council’s Water Section on phone 5449 5254 to obtain an application
form for issue of a key to access Council’s water tanker filling stations. Conditions of access and
location of filling stations are detailed on the application form.
Page 4 of 10
Page 5
2008/658
8. All connections to existing live water mains are to be carried out by Noosa Council at completion
of construction of internal works.
9. All sewerage reticulation mains are to be inspected by closed circuit television (CCTV) prior to
acceptance 'on maintenance'.
CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council
following satisfactory completion of construction works. The developer will be responsible for
the full cost of CCTV inspection, including any additional inspection necessary following defect
identification and rectification . This charge is payable prior to commencement of works and
will be determined on the unit rate basis current at the time of approval.
10. Bi-directional blue fire hydrant raised reflective markers are to be installed as per Noosa Shire
Council requirements (Stimsonite Aust. Pty Ltd, Part No. 911AB or approved equivalent).
11. Bi-directional yellow valve raised reflective markers are to be installed as per Noosa Shire Council
requirements (Stimsonite Aust. Pty Ltd, Part No. 911AY or approved equivalent).
12. All signage, including that for safety during construction shall be in accordance with the Manual of
Uniform Traffic Control Devices and Main Roads Department Roadworks Signing Guide.
13. As Constructed drawings in both hardcopy and digital format (ADAC) produced in GDA94 Zone
56 coordinate value to the standards and requirements of the Assessment Manager are required
for Council records. Such 'as constructed' drawings will be required prior to works being accepted
"on maintenance", where applicable. Requirements for "as constructed" information are detailed
in the current version of Council's Engineering Design Standards (Water & Sewerage) Manual.
Release of plans of survey and/or acceptance of the works on-maintenance will not be
considered until lodgement of satisfactory 'as constructed' records.
Please note that bonding of outstanding works will not be considered by Council.
14. Your company, TOD Consulting Engineers as Consulting Engineers for the project, are
responsible for arranging all inspections and ensuring that all relevant details required by Council
are supplied. The attached Water and Sewerage Inspection Report form is to be kept by you and
presented to Council's Inspector at each stage of the development requiring a meeting or
inspection. The Inspector will sign the form at each stage when conditions have been satisfied.
The works will be accepted 'on maintenance' when this form, signed by the Inspector for each
stage, is returned with a letter requesting that it go 'on maintenance'.
15. It is Council policy that a maintenance bond be imposed on construction works during the
maintenance period. The maintenance bond shall be 5% of the agreed value of the development
obligations, or $1,500 whichever is the greater amount. This bond must be lodged by (and shall
only be accepted from) the Developer for the works.
16. Construction work and other associated activities are permitted only during the hours of 7:00am
and 6:00pm Monday to Saturday. No work is permitted on Sundays or public holidays, except
where extended hours are approved by the Assessment Manager or his nominee.
17. Cut-ins to existing live sewer are to be performed by Approved Contractor. Noosa Council Works
Inspector shall be present during any work on live sewer undertaken by contractor. An additional
fee of $160.00 (included below) is required to cover costs associated with these live sewer works.
Page 5 of 10
Page 6
2008/658
18. Fees applicable to the above project are listed below and are to be paid within fourteen (14) days
of the date of this Decision Notice.
Plan Examination $ 3145
Inspection Fee $ 2805
Checking as-constructed data $ 135.00
CCTV fee $ 2865
SCADA $ -
BALANCE OWING $ PAID 15 April 08 RN 396438
19. Council will provide all fittings and valves for the cut-in to the existing water supply as well as
labour to perform the cut-in. The Developer shall bear the actual cost of this work, and payment
shall be made before the cut-in is done. Costs to be advised.
20. All water connection fees are to be paid prior to the pre-start meeting.
The water main must be commissioned prior to installing the water services and water meters.
The water service tappings on the new water main/s within the development must be undertaken by an
approved subcontractor under direct Council supervision. Tappings on water mains not constructed as
part of the development works are to be carried out by Noosa Shire Council at developer’s cost.
The water & sewerage plans listed below are satisfactory:
Water
06583 – 21 A – Water Supply Layout Plan
Sewer
06583 – 18 A – Sewerage Reticulation Layout Plan
06583 – 19 A – Sewerage Reticulation Longitudinal Sections
06583 – 20 A – Sewerage Reticulation Notes
To be read in conjunction with Retaining Wall & Retention and Bio-rentention Basin Layout
Plans 06583 – 15 A and 06583 – 16 A.
5 REFERRAL AGENCY CONDITIONS
Not Applicable.
6 APPROVED PLANS
The approved plans for this development approval are listed in the following table:
Plan No. Rev. Plan Name Date
06583-1 T1A 27/05/08
Cover Sheet & Locality Plan
06583-2 T1A 27/05/08
Roadworks Alignment Plan
06583-3 T1A 27/05/08
Earthworks Layout Plan
06583-4 T1A 27/05/08
Earthworks Cross Sections
06583-5 T1A 27/05/08
Roadworks & Stormwater Drainage Plan
06583-6 T1A 27/05/08
Longitudinal Section Venture Drive
06583-7 T1A 27/05/08
Cross Sections Venture Drive
06583-8 T1A 27/05/08
Long Section Road 1
Page 6 of 10
Page 7
2008/658
06583-9 T1A 27/05/08
Cross Sections Road 1
06583-10 T1A 27/05/08
Cross Sections Road 1
06583-11 T1A 27/05/08
Intersection & Cul de sac details
06583-12 T1A 27/05/08
Stormwater Dge Long Sections A to K
06583-13 T1A 27/05/08
S/W Dge Long Sectns G to M & MH details
06583-14 T1A 27/05/08
Retaining Wall details
06583-15 T1A 27/05/08
Retaining Wall details
06583-16 T1A 27/05/08
Retention & Bio-retention Basin Plans
06583-17 T1A 27/05/08
Retention Basin Details & Sections
06583-18 T1A 27/05/08
Sewerage Reticulation Layout Plan
06583-19 T1A 27/05/08
Sewerage Reticulation Long Sections
06583-20 T1A 27/05/08
Sewerage Reticulation Notes
06583-21 T1A 27/05/08
Water Supply & Prelim Services Plan
06583-SE1 T3 26/11/07
Sediment & Erosion Management Plan
06583-SE2 P1 July 2007
Sediment & Erosion Mgmt Notes & Detail
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
Should any changes or modifications to the approved plans be required as a result of construction
constraints, a “Request to change an existing approval” (Form 2 Development Application) under the
Integrated Planning Act 1997 must be made. Amended plans clearly indicating the changes must be
lodged with this application along with the appropriate fees.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
Page 7 of 10
Page 8
2008/658
8 PROPERTY NOTES
Not Applicable
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not Applicable.
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Not Applicable
11 SELF ASSESSABLE CODES
Not Applicable
12 SUBMISSIONS
Not Applicable.
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not Applicable
14 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).
15 OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies of Council’s
decision are available on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully
Mark Lewis
ACTING MANAGER – LAND DEVELOPMENT
Page 8 of 10
Page 9
2008/658
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
(5) If an application is processed under section
The following is an extract from the Integrated 6.1.28(2), appeal rights for submitters for the
Planning Act (Chapter 4). application are available only for the aspects of the
Division 8 - Appeals to court relating to development that would have required public
development applications notification under the repealed Act.
Appeals by applicants
(6) If an application involves assessment
4.1.27.(1) An applicant for a development against a concurrence agency code, appeal rights
application may appeal to the court against any of for submitters for the application are not available
the following- against the part of the approval that represents the
(a) the refusal, or the refusal in part, of a concurrence agency’s response for the code.
development application; Appeals by advice agency submitters
(b) a matter stated in a development approval, 4.1.29.(1) An advice agency may, within the limits
including any condition applying to the of its jurisdiction, appeal to the court about the
development, and the identification of a code giving of a development approval for a
1
under section 3.1.6; development application if-
(c) the decision to give a preliminary approval (a) the development application involves impact
when a development permit was applied for; assessment; and
(d) the length of a currency period; (b) the advice agency told the applicant and the
(e) a deemed refusal. assessment manager to treat its response to
(2) An appeal under subsection (1)(a) to (d) the application as a submission for an appeal.
must be started within 20 business days (the (2) The appeal must be started within 20
“applicant’s appeal period”) after the day the business days after the day the decision notice or
decision notice or negotiated decision notice is negotiated decision notice is given to the advice
given to the applicant. agency as a submitter.
(3) An appeal under subsection (1)(e) may be Appeals for matters arising after approval given
started at any time after the last day a decision on (co-respondents)
the matter should have been made. 4.1.30.(1) For a development approval given for a
Appeals by submitters development application, a person to whom any of
4.1.28.(1) A submitter for a development the following notices have been given may appeal
application may appeal to the court about- to the court against the decision in the notice-
(a) the giving of a development approval, including (a) a notice giving a decision on a request for
any conditions (or lack of conditions) or other extension of the currency period for an
provisions of the approval; or approval;
(b) the length of a currency period for the approval. (b) a notice giving a decision on a request to make
a minor change to an approval.
(2) The appeal must be started within 20
business days (the “submitters appeal period”) (2) The appeal must be started within 20
after the day the decision notice or negotiated business days after the day the notice of the
decision notice is given to the submitter. decision is given to the person.
(3) If a person withdraws a submission before (3) Subsection (1)(a) does not apply if the
the application is decided, the person may not approval resulted from a development
appeal the decision. application (superseded planning scheme)
that was assessed as if it were an
(4) If an application involves both impact application under a superseded planning
assessment and code assessment, appeal rights scheme.
for submitters are available only for the part of the
application involving impact assessment. (4) Also, a person who has made a request
mentioned in subsection (1) may appeal to
the court against a deemed refusal of the
1
Section 3.1.6 (Preliminary approval may override request.
local planning instrument)
Page 9 of 10
Page 10
2008/658
(5) An appeal under subsection (4) may be For Building Works Only
started at any time after the last day the Rights of appeal conferred by Section 4.2.9 of the
decision on the matter should have been Integrated Planning Act 1997 as follows:
made.
Division 3 – Appeals to tribunals relating to
development applications
Division 9 - Appeals to court about other
matters Appeals by applicants
Appeals for matters arising after approval given
(no co-respondents)
4.2.9(1) An applicant for a development application
4.1.31.(1) A person to whom any of the following may appeal to the Building and Development
notices have been given may appeal to the court Tribunal against any of the following-
against the decision in the notice-
(a) the refusal, or the refusal in part, of a
(a) a notice giving a decision on a request to development application;
change or cancel a condition of a development
approval. (b) a matter stated in a development approval,
2 including any condition applying to the
(b) a notice under section 6.1.44 giving a decision development, and the identification of a code
to change or cancel a condition of a under section 3.1.6;
3
development approval.
(c) the decision to give a preliminary approval when a
(2) The appeal must be started within 20 development permit was applied for;
business days after the day the notice of the
(d) the length of a period mentioned in section 3.5.21
decision is given to the person.
currency period;
(3) Also, a person who has made a request
(e) a deemed refusal.
mentioned in subsection (1)(a) may appeal
to the court against a deemed refusal of the (2) An appeal under subsection (1)(a) to (d) must
request. be started within 20 business days (the “applicant’s
appeal period”) after the day the decision notice or
(4) An appeal under subsection (3) may be negotiated decision notice is given to the applicant.
started at any time after the last day the
(3) An appeal under subsection (1)(e) may be
decision on the matter should have been started at any time after the last day a decision on the
made. matter should have been made.
Appeals against decisions to change approval The Registrar for the Building and Development
conditions under the repealed Act Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a http://www.localgovernment.qld.gov.au/
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act
may appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice
of the decision is to be given to the person.
(3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on
the matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to
the court against the decision or the conditions
applied.
(2) The appeal must be started within 20
business days after the day notice of the decision
is given to the applicant.
2
Section 6.1.44 (Conditions may be changed or
3
cancelled by assessment manager or concurrence Section 3.1.6 (Preliminary approval may override
agency in certain circumstances) local planning instrument)
Page 10 of 10
Used in these records