2008/658
8. All connections to existing live water mains are to be carried out by Noosa Council at completion
of construction of internal works.
9. All sewerage reticulation mains are to be inspected by closed circuit television (CCTV) prior to
acceptance 'on maintenance'.
CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council
following satisfactory completion of construction works. The developer will be responsible for
the full cost of CCTV inspection, including any additional inspection necessary following defect
identification and rectification . This charge is payable prior to commencement of works and
will be determined on the unit rate basis current at the time of approval.
10. Bi-directional blue fire hydrant raised reflective markers are to be installed as per Noosa Shire
Council requirements (Stimsonite Aust. Pty Ltd, Part No. 911AB or approved equivalent).
11. Bi-directional yellow valve raised reflective markers are to be installed as per Noosa Shire Council
requirements (Stimsonite Aust. Pty Ltd, Part No. 911AY or approved equivalent).
12. All signage, including that for safety during construction shall be in accordance with the Manual of
Uniform Traffic Control Devices and Main Roads Department Roadworks Signing Guide.
13. As Constructed drawings in both hardcopy and digital format (ADAC) produced in GDA94 Zone
56 coordinate value to the standards and requirements of the Assessment Manager are required
for Council records. Such 'as constructed' drawings will be required prior to works being accepted
"on maintenance", where applicable. Requirements for "as constructed" information are detailed
in the current version of Council's Engineering Design Standards (Water & Sewerage) Manual.
Release of plans of survey and/or acceptance of the works on-maintenance will not be
considered until lodgement of satisfactory 'as constructed' records.
Please note that bonding of outstanding works will not be considered by Council.
14. Your company, TOD Consulting Engineers as Consulting Engineers for the project, are
responsible for arranging all inspections and ensuring that all relevant details required by Council
are supplied. The attached Water and Sewerage Inspection Report form is to be kept by you and
presented to Council's Inspector at each stage of the development requiring a meeting or
inspection. The Inspector will sign the form at each stage when conditions have been satisfied.
The works will be accepted 'on maintenance' when this form, signed by the Inspector for each
stage, is returned with a letter requesting that it go 'on maintenance'.
15. It is Council policy that a maintenance bond be imposed on construction works during the
maintenance period. The maintenance bond shall be 5% of the agreed value of the development
obligations, or $1,500 whichever is the greater amount. This bond must be lodged by (and shall
only be accepted from) the Developer for the works.
16. Construction work and other associated activities are permitted only during the hours of 7:00am
and 6:00pm Monday to Saturday. No work is permitted on Sundays or public holidays, except
where extended hours are approved by the Assessment Manager or his nominee.
17. Cut-ins to existing live sewer are to be performed by Approved Contractor. Noosa Council Works
Inspector shall be present during any work on live sewer undertaken by contractor. An additional
fee of $160.00 (included below) is required to cover costs associated with these live sewer works.
Page 5 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00000658.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 70 KB (small file)
- File type
No other editions are linked here.