Original source · versioned page text
Approved Plans and Documents - OPW22/0303
9 February 2023
Table of Contents
1 INTRODUCTION 3
2 CONSTRUCTION PHASE 3
3 OPERATIONAL PHASE 4
3.1.1 Bioretention Basin....................................................................................................................................... 4
3.1.2 Rainwater Harvesting Tank ..................................................................................................................... 5
3.1.3 Basement Pump Systems .......................................................................................................................... 7
Table of Tables
Table 1 - General recommended program of inspection and maintenance – Bioretention Basin 5
Table 2 - General recommended program of inspection and maintenance – Rainwater tanks 6
Table of Appendices
Appendix 1 MPN Plans 8
Appendix 2 Bioretention Basin Construction Checklists and Forms 9
Appendix 3 Bioretention Basin Maintenance Checklist 10
Appendix 4 Rainwater Tank Maintenance Checklist 12
Excellence with Economy in Engineering 2
https://mpncnetau.sharepoint.com/sites/administration/shared documents/8000-8999/8600-
8699/8662/reports/09-02-23 operational management and maintenance plan_issue b.docx`
Document Set ID: 22315062
Version: 1, Version Date: 20/02/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Approved Plans and Documents - OPW22_0303.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.