Original source · versioned page text
Approved Plans and Documents - OPW22/0303
FORM C — BIORETENTION MEDIA (CONT.) INSTALLATION OF BIORETENTION MEDIA ACTION (IF CHECKED SATISFACTORY UNSATISFACTORY) | | INITIAL Base of system free from debris Drainage layer (fine gravel) installed to correct depth (+25 mm) Transition layer (coarse sand) installed to correct depth (+25 mm) Placement of filter media completed to avoid compaction of media and using at least two lifts Filter media installed to correct depth Light, even compaction applied to remove air gaps (e.g. light roller or single pass with a ‘pozitrack’ bobcat) Spreader bar used to flatten surface of | filter media | Sediment fences in place , INSPECTION: Superintendent and bioretention designer inspection and sign-off to occur while installation of media is occurring. Photos must be taken by the superintendent, the bioretention designer or the contractor. Comments (attach and refer to additional pages if necessary) NB: Laboratory test results, certification, delivery dockets and photos attached Signed by superintendent: Signed by bioretention designer: Print name: Print name: Date: Date: Document Set ID 22315062 =, Version: 1, Version Date: 20/02/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Approved Plans and Documents - OPW22_0303.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.