Approved Plans and Documents - OPW22/0303
FORM D — FINISHED LEVELS Purpose: To ensure finished levels of system surface and bunds are correct and meet the design. ITEMS Landscaping topsoil applied to surrounding bunds to achieve design levels As-constructed survey of system surface | and surrounding bunds completed Final constructed levels are consistent with design levels Under-drainage clean-outs extended 50- 150 mm above filter media Under-drainage pipes flushed to remove initial ingress of material CHECKED i ACTION (IF RALICEAETORY, UNSATISFACTORY) HOLD POINT: Superintendent and bioretention designer inspection and sign-off before proceeding. Comments (attach and refer to additional pages if necessary) NB: As constructed survey and drawings and photos attached Signed by superintendent: Print name: Date: Document Set ID: 22315062 Version: 1, Version Date: 20/02/2023 Signed by bioretention designer: Print name: Date: INITIAL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Approved Plans and Documents - OPW22_0303.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.