Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Approved Plans and Documents - OPW22/0303.pdf

of 102
                                                                                          Consult Arborist




    Figure 5: Plan extract from MPN Stormwater Treatment Plan stating Realign Existing Swale with batter
                               created to deepen the existing shallow swale drain



The creation of the Swale batter will directly conflict with the surface root of the surveyed trees
on the southern boundary of the covenant area.

Access to the swale area will also be required to assist with the construction of the building.
Site-specific tree and/or ground protection measures will need to be implemented to limit the
ground disturbance whilst fulfilling the approved project design.




22_11_21_TMP_Stockwell_Medihub                                                                   Page 9 of 22

Log in to download the original (Approved Plans and Documents - OPW22_0303.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.