Original source · versioned page text
Approved Plans and Documents - OPW22/0303.pdf
Consult Arborist 7 T REE P RO TECT ION G UID ELINES For the proposed retention of the trees onsite, the following guidelines are recommended to be implemented to minimise the impact of the project works. The protection recommendations offered are guided by, AS4790 – 2009 Protection of trees on development sites, industry best practices and the supervising presence of a suitably qualified and experienced Arborist with a high level of experience as an onsite Project Arborist. The information within these Guidelines is generic for practical use with common sense and discretion. The successful retention of the trees will be bettered by the education and cooperation of all parties of the construction team during the build and the presence of the Project Arborist on site to assist and advise during the construction phase for all works carried out adjacent to the TPZ of protected trees. ALL workers on the site are to be made aware of the Tree Protection Guidelines and any site- specific measures by the main contractor prior to commencing works. 7.1 THE ROLE OF THE PROJECT ARBORIST AND TREE PROTECTION An Arboricultural Assessment undertaken by the Project Arborist will outline the trees that require consideration. The information within these Tree Protection Guidelines should be read in conjunction with guidelines laid out in the Australian Standard, AS4970–2009 Protection of Trees on Development Sites and ongoing advice from the Project Arborist. A designated onsite foreman/supervisor from the construction company is to liaise with the Project Arborist to ensure that Tree Protection is adhered to in their absence from the site. A Post Construction Arborist Report can be prepared by the Project Arborist on request for the retained tree comprising a Visual Tree Assessment detailing each of the trees’ condition and vigour, damage or disturbance which may have occurred, and remedial works are undertaken. After the final inspection, a Certification of Compliance can be supplied along with any monitoring documentation as required. The Project Arborist may at any time implement new or additional procedures as may be required for the site in the best interest of the trees and the development as a whole. 22_11_21_TMP_Stockwell_Medihub Page 14 of 22
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Approved Plans and Documents - OPW22_0303.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.