10 August, 1998

SUPERIOR JETTY CONSTRCUTIONS
PO BOX 920
NERANG QLD 4211

Dear Sir/Madam,

Re:

Application for a Jetty at 30 The Anchorage described as Lot 783 on RP 910420

With reference to the above matter, I wish to advise that your application has been approved,
subject to the following conditions:-

Ii

The jetty is to be used for private purposes only, and no commercial operations are to be
undertaken.

The jetty shall be licensed with the Council upon completion of the structural work and
shall be licensed annually thereafter.

The jetty is to comply with the requirements of Council's By-laws and Jetty, Wharves,
Pontoons and Boat Ramps Policy.

The approval or conditions do not constitute a ruling on structural safety and the applicant
must make their own arrangements to ensure adequacy of design and work.

Approved plans comprising C1 and 004 dated June 1995, as amended by Council officers,
copies of which are attached.

This approval lapses where the construction of the jetty has not commenced within two (2)
years of the date of issue of the approval, unless application is made and approved by
Council for an extension.

Jetties should be designed and constructed such that they are free standing within the
waterway and are not connected to or behind the revetment wall.

Jetties should have a level walking surface of R.L 1.000 A.H.D or be level with the top of
the revetment wall.

AOP-1 c:\prod\word\doc\jetties\letters\12806-mackenzie .doc
Full text of the other 1 page

Page 2

Superior Jetty Constructions 10 August, 1998

9. Rock scour protection, wrapped in geotextile, extends 750 mm from the face of the
revetment wall. Piles are to be located clear of this rock protection.

10. In some areas, rock scour protection wrapped in geotextile extends 3000mm from the face
of the revetment wall. Prior to driving piles in these areas, the rocks are to be removed to
expose the geotextile and holes cut through the geotextile. Care is to be taken during
driving to ensure the geotextile is not damaged. Rocks are to be placed around piles upon
completion of driving.

Please return the attached ‘Request for Inspection” cards prior to the works being commenced
and also prior to completion. Upon completion of the relevant works and their
inspection and approval by Council’s Engineering Department, arrangements will be
made for the return of the $500 bond fee.

Yours faithfully,

AC)

Nadine Gorton
PLANNING OFFICER

AOP-1 c:\prod\word\doe\etties\Vetters\] 2806-mackenzie .doc

Used in these records

About this file

File size
294 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Jetty approval - 30 The Anchorage.pdf · 294 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.