Council archive · source document
SUPERSEDED Jetty approval - 30 The Anchorage · OPW18/0080
Superior Jetty Constructions 10 August, 1998 9. Rock scour protection, wrapped in geotextile, extends 750 mm from the face of the revetment wall. Piles are to be located clear of this rock protection. 10. In some areas, rock scour protection wrapped in geotextile extends 3000mm from the face of the revetment wall. Prior to driving piles in these areas, the rocks are to be removed to expose the geotextile and holes cut through the geotextile. Care is to be taken during driving to ensure the geotextile is not damaged. Rocks are to be placed around piles upon completion of driving. Please return the attached ‘Request for Inspection” cards prior to the works being commenced and also prior to completion. Upon completion of the relevant works and their inspection and approval by Council’s Engineering Department, arrangements will be made for the return of the $500 bond fee. Yours faithfully, AC) Nadine Gorton PLANNING OFFICER AOP-1 c:\prod\word\doe\etties\Vetters\] 2806-mackenzie .doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Jetty approval - 30 The AnchorageRelated documentApplication case desk ↗
About this file
- File size
- 294 KB (small file)
- File type
No other editions are linked here.