Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Decision Notice - 010.2009.00000945.001 [As Published] SUPERCEDED · 142009.945

of 7

Text shows just the words. Original shows the document exactly as it was published.

                                               Officer:          Ron Read
                                               Direct Telephone: (07) 5449 5263
                                               Response Address: Locked Bag 72
                                                                 Sunshine Coast Mail Centre QLD 4560
                                               Email:            [email protected]
                                               Our Reference:    2009/945
                                               Your Reference:




14 September 2009

Martoo Consulting Pty Ltd
PO Box 1684
NOOSA HEADS QLD 4567



Dear Sir/Madam

                                       Decision Notice
                                    Integrated Planning Act 1997

I refer to your application and advise that on 10 September 2009 Council decided to approve the
application in full subject to conditions.
Details of the decision are as follows:

1        APPLICATION DETAILS

    Application No:                   2009/945
    Street address:                   75 Ben Lexcen Drive SUNSHINE BEACH
    Real property description:        LOT: 1 RP: 198277
    Planning Scheme:                  The Noosa Plan

2        DECISION DETAILS
The following type of approval has been issued:
        Development Permit for Operational Works - Minor Earthworks, Cricket Nets / Netball Court
3        RELEVANT PERIOD OF APPROVAL
This Development Permit lapses if the development has not happened by 10 September 2011
(2 years from Council’s original decision), unless application to extend the relevant period is
approved by Council.

4        ASSESSMENT MANAGER CONDITIONS

1.       The development shall be carried out in accordance with the approved plans listed below or as
         modified herein.
2.       Access to Building Site:
         a.    Metal/rock shaker area shall be located within the school property, the existing concrete
               pathway must remain open and clear of obstructions.


                                                                                          Page 1 of 7
Full text of the other 6 pages

Page 2

                                                                                          2009/945



     b.     Damaged kerb and channel shall be replaced with ‘barrier’ type not ‘roll over’ as
            indicated on drawing 09541-C1E.
     c.     At completion of construction the vegetation buffer shall be restored, between the tennis
            court and property fence, with similar endemic tree species that previously existed in
            this location.
3.   Access to proposed netball courts:
     a.     The existing bikeway/footpath in Bicentennial Drive must remain open and clear of any
            obstructions.
     b.     All sediment control devices shall be located within the school property.
4.   A Traffic Management Plan (TMP) for the development addressing all construction phases
     shall be prepared by suitably qualified persons and submitted to Council for approval prior to
     the pre start meeting. The TMP shall address, but not be limited to, all items listed below, and
     shall be flexible in that it addresses all stages of the development:
     4.1.   The nominated accesses location to and from the site.
     4.2.   The plan should detail the routing of trucks to and from the site.
     4.3.   Delivery vehicles and trucks to the site should only operate outside the peak school
            drop off and pick up times namely 8.00am to9.00am and 2.30pm to 3.30pm.
     4.4.   Provision of onsite parking for personnel working on this development, as there is
            limited parking available in adjacent streets, especially at the school peak times.
     4.5.   Provision of safe cycle and pedestrian movements in the vicinity of the development on
            Bicentennial Drive and the Bicentennial Hall car park area.
     4.6.   No queuing of trucks is permitted on residential streets, especially prior to 7.00am.
            Further parked trucks must have engines turned off.
     4.7.   Provision of signage and traffic controllers in accordance with Manual of Uniform Traffic
            Control Devices and Transport Infrastructure (Roads) Act.
     4.8.   Provide an indication where the surplus spoil is to be transported to, and/or source of
            imported fill material.
5.   Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily
     installed into the first existing external downstream stormwater structure.
     These devices are to be checked and cleaned on a regular basis and specifically after each
     rain event.
     These devices are to remain in place during the civil works and construction phases of the
     development.
     The location and type of device to be installed shall be established at the “pre start” meeting
     with Council’s Construction Technical Officer and shall be installed prior to the
     commencement of any works.
6.   A site control and/or compliance bond of $3000 Officer to determine amount specific to
     application is to be submitted to Council prior to the pre-start meeting. The pre-start meeting
     will only be held once Council's Construction Technical Officer has confirmation that the bond
     monies have been received by Council.
     The bond will be refunded less any costs incurred by Council in ensuring compliance with
     these conditions or any additional inspections incurred for substandard work or work
     undertaken not in accordance with this permit.



                                                                                        Page 2 of 7

Page 3

                                                                                           2009/945



7.    Council’s Construction Engineering Officer (ph 0410 512 537), shall be given seven (7) days’
      notice of intention to commence works to arrange a “pre start” meeting prior to the
      commencement of works.
8.    The principal contractor must have all the appropriate insurance and public liability
      documentation to carry out the works. The principal contractor is also responsible to ensure
      that any sub contractors also have the appropriate insurance and public liability
      documentation.
9.    Prior to the “pre start” meeting, the principal contractor must be provided with a copy of
      Council’s signed approved drawings and conditions by the applicant.
10.   The Consulting Engineers for the project shall be currently Registered Professional Engineers
      of Queensland (RPEQ). The Consulting Engineers are responsible for arranging all
      inspections with Council’s Construction Technical Officer or nominated staff.
11.   Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
      project. (This person will be the contact for the project).
12.   Council standards shall apply to these works unless otherwise modified herein.
13.   The person acting on this permit shall ensure that its consultants and contractors take all
      reasonable care during the construction of the engineering works to ensure that Council
      property, road pavements or facilities (such as underground drainage, water supply,
      sewerage, footpaths, kerbing, landscaping, street furniture etc.) are protected against any
      damage or interference whatsoever.
      If any Council property or facilities should be damaged by the Applicant or any of its
      Consultants or Contractors through any cause whatsoever in the course of, directly or
      indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
      forthwith notify the Chief Executive Officer, Sunshine Coast Regional Council, and shall
      forthwith rectify the damage to that property or facility at its cost and to the satisfaction of the
      Chief Executive Officer, Sunshine Coast Regional Council.
      All rectification works are to be completed prior to the commencement of the use or,
      alternatively, the Applicant may request the Council to carry out the rectification work at the
      Applicant’s cost, such cost being paid by the Applicant to Council prior to the commencement
      of the use.
      In the case of any emergency Council shall be entitled to rectify such damage at the cost of
      the Applicant, such cost being paid prior to the commencement of the use.
14.   The development of the site shall be carried out in such a manner as to prevent dust and/or
      sand nuisance to residents and/or tenants in the vicinity of the development.
15.   Construction work and other associated activities are permitted only during the hours of 7.00
      am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays,
      except where extended hours are approved by Council’s CEO.
16.   All signage, including that for safety during construction shall be in accordance with the
      Manual of Uniform Traffic Control Devices and Transport Infrastructure (Roads) Act.
17.   Safe pedestrian access on Bicentennial Drive and Bicentennial Hall Car Park in the vicinity
      of the development shall be maintained at all times. Should footpath / road closures be
      necessary to carry out construction works, Council’s Construction Engineering Officer (ph
      0410 512 537) must be notified prior to the proposed closure.
18.   Sediment and erosion control measures must be in place prior to works commencing. If such
      measures are not in place or are not satisfactory, “on the spot “fines may be issued. Such
      fines can be issued if sediments from the site are found to enter or have the potential to enter
      Council’s stormwater system or natural waterways. Although the sediment and erosion control
      measures have been approved, it is the site's supervising engineer who is responsible for

                                                                                        Page 3 of 7

Page 4

                                                                                          2009/945



      ensuring that the sediment and erosion control measures have been designed by an RPEQ or
      CPESC and constructed:
      18.1. In accordance with "best practise" methods,
      18.2. Revised by an RPEQ or CPESC to address the issues raised by changes in the
            projected construction schedule and methods,
      18.3. Revised to address predicted rainfall events, and
      18.4. Achieve the desired environmental outcomes.
      Council’s Chief Executive Officer may request further controls to be installed should approved
      measures be inefficient.
19.   A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will
      be imposed on construction works during the maintenance period, which is a minimum period
      of 12 months duration. Such bond must be lodged by, and shall only be accepted from the
      Developer for the works.
20.   The works to become Council assets will not be accepted "On Maintenance" until the
      landscaping is completed.
21.   Notwithstanding that Council has checked the plans with due care, where it is found during
      construction that variations from Council's standards exist, then Council standards shall apply

5     REFERRAL AGENCY CONDITIONS
Not Applicable.

6     APPROVED PLANS

The approved plans for this development approval are listed in the following table:

 Plan No.             Rev.     Plan Name                                       Date
 09541 C1             E        Earthworks Plan by Tod Consulting               10 September 2009
 09541 C2             D        Earthworks Plan by Tod Consulting               10 September 2009

7     ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.    Should any changes or modifications to the approved plans be required as a result of
      construction constraints, a “Request to change an existing approval” (Form 2Development
      Application) under the Integrated Planning Act 1997 must be made. Amended plans clearly
      indicating the changes must be lodged with this application along with the appropriate fees.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.


                                                                                        Page 4 of 7

Page 5

                                                                                      2009/945



You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8     PROPERTY NOTES

Not Applicable.

9     PRELIMINARY APPROVAL OVERRIDING SCHEME
Not Applicable.

10    FURTHER DEVELOPMENT PERMITS REQUIRED

Not Applicable.
11    SELF ASSESSABLE CODES

Not Applicable.

12    SUBMISSIONS
Not Applicable.

13    REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not Applicable.

14    RIGHTS OF APPEAL

You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).

15    OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.

Yours faithfully




Ron Read
SENIOR ENGINEERING OFFICER
OPERATIONAL WORKS ASSESSMENT BRANCH




                                                                                    Page 5 of 7

Page 6

                                                                                                       2009/945



                                                        Appeal Rights
                                                    INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




The following is an extract from the Integrated
                                                                    (6) If an application involves assessment against a
Planning Act (Chapter 4).                                      concurrence agency code, appeal rights for submitters
Division 8 - Appeals to court relating to                      for the application are not available against the part of
development applications                                       the approval that represents the concurrence agency’s
                                                               response for the code.
Appeals by applicants
                                                               Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application
may appeal to the court against any of the following-          4.1.29.(1) An advice agency may, within the limits of
                                                               its jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development      development approval for a development application
      application;                                             if-
(b) a matter stated in a development approval,                 (a) the development application involves impact
      including any condition applying to the                      assessment; and
      development, and the identification of a code
      under section 3.1.6;1                                    (b) the advice agency told the applicant and the
                                                                  assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a            application as a submission for an appeal.
      development permit was applied for;
                                                                  (2) The appeal must be started within 20 business
(d) the length of a relevant period;                           days after the day the decision notice or negotiated
(e) a deemed refusal.                                          decision notice is given to the advice agency as a
    (2) An appeal under subsection (1)(a) to (d) must          submitter.
be started within 20 business days (the “applicant’s           Appeals for matters arising after approval given
appeal period”) after the day the decision notice or           (co-respondents)
negotiated decision notice is given to the applicant.          4.1.30.(1) For a development approval given for a
    (3) An appeal under subsection (1)(e) may be               development application, a person to whom any of the
started at any time after the last day a decision on the       following notices have been given may appeal to the
matter should have been made.                                  court against the decision in the notice-
Appeals by submitters                                          (a) a notice giving a decision on a request for
4.1.28.(1) A submitter for a development application               extension of the relevant period for an approval;
may appeal to the court about-                                 (b) a notice giving a decision on a request to make a
(a) the giving of a development approval, including                minor change to an approval.
      any conditions (or lack of conditions) or other              (2) The appeal must be started within 20 business
      provisions of the approval; or                           days after the day the notice of the decision is given to
(b) the length of a relevant period for the approval.          the person.
    (2) The appeal must be started within 20 business                (3) Subsection (1)(a) does not apply if the
days (the “submitters appeal period”) after the day            approval resulted from a development application
the decision notice or negotiated decision notice is           (superseded planning scheme) that was assessed as
given to the submitter.                                        if it were an application under a superseded planning
                                                               scheme.
    (3) If a person withdraws a submission before the
application is decided, the person may not appeal the             (4) Also, a person who has made a request
decision.                                                      mentioned in subsection (1) may appeal to the court
                                                               against a deemed refusal of the request.
    (4) If an application involves both impact
assessment and code assessment, appeal rights for                 (5) An appeal under subsection (4) may be started
submitters are available only for the part of the              at any time after the last day the decision on the
application involving impact assessment.                       matter should have been made.
    (5) If an application is processed under section           Division 9 - Appeals to court about other matters
6.1.28(2), appeal rights for submitters for the                Appeals for matters arising after approval given
application are available only for the aspects of the          (no co-respondents)
development that would have required public
notification under the repealed Act.                           4.1.31.(1) A person to whom any of the following
                                                               notices have been given may appeal to the court
                                                               against the decision in the notice-
a.
1
                                                               (a) a notice giving a decision on a request to change
     Section 3.1.6 (Preliminary approval may override              or cancel a condition of a development approval.
    local planning instrument)
                                                                                                     Page 6 of 7

Page 7

                                                                                                    2009/945

(b) a notice under section 6.1.442 giving a decision to     (d) the length of a period mentioned in section 3.5.21
     change or cancel a condition of a development                relevant period;
     approval.                                              (e) a deemed refusal.
    (2) The appeal must be started within 20 business           (2) An appeal under subsection (1)(a) to (d) must
days after the day the notice of the decision is given to   be started within 20 business days (the “applicant’s
the person.                                                 appeal period”) after the day the decision notice or
   (3) Also, a person who has made a request                negotiated decision notice is given to the applicant.
mentioned in subsection (1)(a) may appeal to the                (3) An appeal under subsection (1)(e) may be
court against a deemed refusal of the request.              started at any time after the last day a decision on the
    (4) An appeal under subsection (3) may be started       matter should have been made.
at any time after the last day the decision on the          The Registrar for the Building and Development
matter should have been made.                               Tribunal may be contacted at the website
Appeals against decisions to change approval                http://www.localgovernment.qld.gov.au/
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
                                                            For Infrastructure Charges Only
decision made on an application to change the               4.1.36 Appeals about particular infrastructure
conditions attached to an approval given under              charges
section 2.19(3)or section 4.4 of the repealed Act may       (1) This section applies to a person who has been
appeal to the court against-                                given, and is dissatisfied with, an infrastructure
(a) the decision; or                                        charges notice or a regulated State infrastructure
(b) a deemed refusal of the application.                    charges notice.
    (2) An appeal under subsection (1)(a) must be           (2) The person may appeal to the court against the
started within 20 business days after the day notice of     notice.
the decision is to be given to the person.                  (3) The appeal must be started within 20 business
    (3) An appeal under subsection (1)(b) may be            days after-
started at any time after the last day a decision on the    (a) if the notice is given because of a development
matter should have been made.                                    approval or master plan approval-the day the
Appeals against local laws                                       applicant is given notice of the decision about the
                                                                 approval; or
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions            (b)    otherwise-the day the notice is given to the
applied under a local law about the use of premises or             person.
the erection of a building or other structure permitted     (4) An appeal under this section may only be about-
by the planning scheme may appeal to the court              (a) whether a charge in the notice is so
against the decision or the conditions applied.                  unreasonable that no reasonable relevant local
    (2) The appeal must be started within 20 business            government, State infrastructure provider or
days after the day notice of the decision is given to the        coordinating agency could have imposed it; or
applicant.                                                  (b) an error in the calculation of the charge.
For Building Works Only                                     (5) To remove any doubt, it is declared that an
Rights of appeal conferred by Section 4.2.9 of the          appeal under this section can not be about the
Integrated Planning Act 1997 as follows:                    methodology used to establish the charge in the
                                                            relevant infrastructure charges schedule or regulated
Division 3 – Appeals to tribunals relating to
                                                            State infrastructure charges schedule.
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application
may appeal to the Building and Development Tribunal
against any of the following-
(a) the refusal, or the refusal in part, of a development
     application;
(b) a matter stated in a development approval,
     including any condition applying to the
     development, and the identification of a code
     under section 3.1.6;3
(c) the decision to give a preliminary approval when a
     development permit was applied for;

a.
2
   Section 6.1.44 (Conditions may be changed or
  cancelled by assessment manager or concurrence
  agency in certain circumstances)
3
   Section 3.1.6 (Preliminary approval may override
  local planning instrument)
                                                                                                 Page 7 of 7

Used in these records

About this file

File size
57 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2009.00000945.001 [As Published] SUPERCEDED.pdf · 57 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.