Effluent Disposal Report_compressed

of 9

Page text shows just the words. Original shows the document exactly as it was published.

Ground Drill Pty Ltd                                     PH - 0407035220
ATF The Bennett Family Trust                             W - www.grounddrill.com.au
ABN - 15204820396                                        E - [email protected]
QBCC Lic – 15034580                                      Cedar Pocket QLD 4570




                            Effluent Disposal Report



Job No: 22/388


Date: 11/11/22


Client: QRE Construction


Site Address: 332 Eastern Branch Road, Kin Kin


Proposed Structure: Proposed Glamping Tents & Amenities Blocks


Information Provided by the Client: Site Plan & Site Meeting


Local Authority: Noosa Shire Council
Log in to download the original file

Effluent Disposal Report_compressed.pdf · 326 KB (small file)

Full text of the other 8 pages

Page 2

Introduction

The purpose of this report is to evaluate and design a suitable on-site treatment system and disposal
area in accordance with AS 1547 – 2012, the Queensland Plumbing and Wastewater Code, the
Plumbing and Drainage Act, The Environmental Protection Act & Local Authority requirements.
The report relates exclusively to the above site and the proposed and or existing buildings shown on
the plan only. All measurements and levels shown are as accurate as possible with the information
provided these are to be used for locating the onsite effluent disposal system only.


Site Description

 Weather Conditions                                               Scattered showers
 Slope                                                                  18-22%
 Slope Stability                                              To be addressed by others
 Vegetation                                                     Grassed, scattered trees
 Fill                                                                     Nil
 Flooding                                                                 Nil
 Watercourses                                                       Present >10m
 Site exposure                                                        Sun & wind
 Salinity                                                                 Nil
 Surface condition                                        Nil cracks, seepage or compaction
 Boulders & Rock outcrops                                                 Nil
 Will water from uphill traverse the area                  Yes, diversion drain to prevent
 Water table                                                              Nil

Soil Category (AS1547-2012 Table M1)

 Borehole                        0-0.1m                 0.1-0.6m
 BH1-BH3                          Cat 4                   Cat 5
                              Clay Loams               Light Clays
                            Weakly Structured      Moderately Structured
                              0.12-0.5m/d             0.06-0.12m/d

Recommended Design Irrigation Rate

 Test Result                                                             0.07
 Recommended Design Irrigation Rate                                    3mm/day
 Adopted Rate                                                         3/mm/day

Calculations

 Bedrooms                                                 5 (5 x 1 bedroom glamping tents)
 Persons                                                                  10
 DIR (mm/day)                                                              3
 Litres per person per day (Tank supply)                                 120
 Calculations                                                   10x120=1200 /3= 400
 Disposal Area Required                               400m2 Heavy Droplet Surface Irrigation

Page 3

Risk Assessment

                     Risk                                            Risk Mitigation
                Surface Runoff                                       Diversion Drain
               Human Contact                             Signs to identify area. Apply by setbacks
        Overloading of system and LAA                     Use correct DIR, flow allowances and
                                                                   maximum occupancy


Performance Solution

   •   The design has considered site and soil conditions and has also been discussed with the
       landowner.

   •   Irrigation area has been designed using correct DIR.

   •   The spray from the sprinklers shall not exceed 500mm in height, 2000mm in dia. (1m
       throw) and be heavy droplet in nature that prevents misting and drift. Control valves may be
       needed to adjust the flow and pressure to achieve this.

   •   All pipework and materials used are to be new, meet relevant standards and be fit for use.

   •   Category 4 soils or better will assist in even distribution of treated effluent.

Page 4

Recommendations

      Treatment

      The amenities blocks are to be serviced by septic tanks, pump wells and an Advanced
      Secondary ASTP/Sand filter fitted with a large capacity pump. See plan for location &
      layout. (System must be approved by QLD Depart of Housing & Public Works)

  •   Installer to ensure tank position does not damage to existing or proposed structures and does
      not cause audible disturbance to nearby residences once final site plan and earthworks are
      known. (Tank position on plan is indicative, final positioning to be nominated by installer)

  •   The tank must be installed and anchored, if necessary, to prevent flotation.
      Installer to confirm sufficient fall is available to the treatment plant prior to installation once
      the floor height is known.

  •   Top of treatment plant shall be at least 150mm above any flood levels that are present.

  •   A filter must be installed in between treatment plant and irrigation area

  •   Pump must have sufficient power to pressurise the irrigation area, controls valves may be
      necessary on the irrigation lines to restrict flow to prevent sprays misting or drifting outside
      the designated land application area.

  •   Two signs are to be erected stating “Effluent Water, Avoid Contact, Do not drink”

  •   Flexible joints should be used from the treatment to the proposed/existing structure where
      the site is “H1” or higher.

      Irrigation Area

      A 400sqm fixed surface irrigation area consisting of fixed heavy droplet sprinklers
      300mm high and a maximum spray diameter of 2m and height of 0.5m. (see plan)

  •   All pipework and fittings used must meet relevant Australian Standards be buried, withstand
      150% of pump shut-off-head and be fit for use.

  •   The supply line from the treatment plant to the irrigation area shall be buried 25-32mm
      purple line poly within a 200mm layer sand bed to prevent damage.

  •   The area is to be installed in a way that creates no pooling or runoff.

  •   The installer is to install non return valves to evenly distribute effluent and prevent back to
      the treatment plant.

  •   A reserve area equal to the above area is available.

      Diversion and Vegetation Requirements

  •   The area is to have a shallow diversion drain or mound uphill of the area to divert surface
      water around the area.
  •   The area is to be mulched & densely planted out with water tolerant shrubs & grasses.
  •   All Storm water from the residence and uphill slopes is to be diverted away from the area.

Page 5

Setbacks

        The below minimum setbacks must be complied with when installing the system. Greater
        setbacks may be stipulated on the plan due to site and soil conditions.

        (Advanced Secondary)

        Surface & Covered Surface Irrigation

        10M from a watercourse, dam, table drain, bore etc.
        10M from a dwelling or habitable building or recreation area.
        2M from a boundary/driveway if it slopes away or is level with that boundary/driveway.
        4M from boundary/driveway if it slopes towards that boundary/driveway
        6M from an inground water tank
        6M from pool edge.



Maintenance, usage, and installation notes

    The installer, builder and homeowner should families themselves with the below.

    •   Scrape all dishes to remove fats, grease, etc. before washing
    •   Don't use a garbage grinder
    •   Use biodegradable soaps
    •   Use a low-phosphorus detergent, don't use powerful bleaches
    •   Don't put sanitary napkins and other hygiene products into the system
    •   Spray or irrigation areas should have access restricted
    •   Divert surface water away from land application area
    •   No vehicles or stock should be allowed on trenches, beds or irrigation area.
    •   Deep rooting trees or shrubs should not be grown over absorption trenches or pipes
    •   Vegetable gardens and/or fruit trees should not be planted within or near area, where there
        is a possibility of airborne spray coming into contact with the plant.
    •   Structures should not be constructed near areas that encourage people to congregate.
    •   Play areas and equipment should be well away from areas where there is no possibility of
        spray coming into contact with humans.
    •   Treatment plants and septic tanks are to be desludged every 3-5 years.
    •   If any part of this design is unclear, please call before buying products or installing.
    •   This report must be approved by the local authority and appropriate permits issued before
        any works can be undertaken.
    •   Installer is to contact local council prior to burying the system for a site inspection and
        certification.
    •   Follow the manufacturer's instructions, relevant codes, standards and guidelines for
        installation, servicing, maintaining and cleaning the system and irrigation
        area/trenches/beds.
    •   The Treatment Plant is to be placed on an approved service schedule

Page 6

Limitations of Report & Notes

       This report is based on information gathered from the field investigation and information
       provided by the client if any. Ground Drill should be notified immediately if ground
       conditions are found to differ from this report.

       Unless otherwise stated this report does not address the following issues;
   •   Mining Subsidence.
   •   Slope Stability (If the site is in a known slip area or is steep, it is recommended that a
       Geotechnical Engineer be engaged to conduct a Slope Stability assessment).
   •   Deep soft or settling soils
   •   Soil Contamination, hazardous materials and or acid sulphate.
   •   Any slopes, dimensions, levels, site features or plans in this report are approximate only
       show approximate testing locations.
   •   Flood levels (It is the client’s responsibility to inform us of any flood levels on the
       allotment).
   •   If water is found in the boreholes this depth may vary greatly over time. This report does not
       address the influence any natural springs may have on the structure.
   •   It is the client’s responsibility to inform us of any nearby underground services that have
       been or will be installed near the proposed area.
   •   Earthworks could affect the design.
   •   If any fill is placed on the allotment post investigation this could change the design.
   •   Surface water is to be diverted away from the area.
   •   This investigation undertaken consisted of the occluded boreholes/test pits, given the size of
       the site it is possible that a problem could have been missed. eg. Filled dam/gully, soft soils,
       fill, springs, boulders, rock etc. We cannot give a definitive assurance that none of these
       problems exist on the site unless we did a greater number of boreholes which would be
       uneconomical and impractical.
   •   Ground Drill will not be liable for any Council Inspection, submission or reviewing fees due
       to changes in report or plan requested by client or Council.
   •   No allowance has been made for spa baths




Authorised Signatory


Matthew Bennett
on behalf of Ground Drill Pty Ltd
QBCC Lic # 15034580

Page 7

       Soil Profiles

BH 1            Soil Description         BH 2             Soil Description         BH 3             Soil Description
0      CLAYEY SILT (ML) – Brown, low     0      CLAYEY SILT (ML) – Brown, low 0           CLAYEY SILT (ML) – Brown, low
       plasticity fines, moist, firm.           plasticity fines, moist, firm.            plasticity fines, moist, firm.
100    SILTY CLAY (CH) – High plasticity, 100   SILTY CLAY (CH) – High             100    SILTY CLAY (CH) – High plasticity,
       brown, trace fine to medium gravel,      plasticity, brown, trace fine to          brown, trace fine to medium gravel,
       moist, firm.                             medium gravel, moist, firm.               moist, firm.
200                                      200                                       200
300                                      300                                       300
400                                      400                                       400
500                                      500                                       500
600    Hand Auger Refusal                600    Hand Auger Refusal                 600    Hand Auger Refusal
700                                      700                                       700
800                                      800                                       800
900                                      900                                       900

1000                                     1000                                      1000

1100                                     1100                                      1100
1200                                     1200                                      1200
1300                                     1300                                      1300
1400                                     1400                                      1400
1500                                     1500                                      1500


       Site Photo

Page 8

   To
   Advanced                   Proposed
   Secondary                  K-Rain
   ASTP                       Valve




                                                                                                 10m
                                                           40m




Fixed Sprinkler layout                   Ground Drill Pty Ltd
See site plan for location.              Sunshine Coast, QLD.
NTS                                      QBCC # 150 345 80            C:\Users\Ground Drill Desktop\Documents\Advertising\print\logo.jpg

                                         E: [email protected]
                                         W: www.grounddrill.com.au
                                         P: 0407 035 220

Page 9

 Notes
Levels shown are
approximate and are sourced
from local council mapping                                                                                                                                                                                          N
or information provided by
the client. These levels are
solely to demonstrate the
functionality of the system.
Actual floor height is to be
confirmed with the builder
prior to installation.
All pipe work from the
structure to the proposed                                                                                                                                            Proposed
system should be covered                                                                                                                                             Amenities Block
and adequately vented and                                                                                                         Proposed Advanced                  (Approx RL 81)
                                                                                                                    Proposed
be vermin/insect proof.                                                                                                           Secondary
                                                                                                     0m             4000L
All work carried out should                                                                       29                              Treatment Plant
                                                                                                                    Septic
meet relevant                                                                                                                     (Approx RL 83)                      Proposed
                                                                                                                    Tank
codes/standards and be done                                                                                                                                           4000L
by an appropriately qualified                                                                                                                                         Septic
and licensed person.                                                                                                                                                  Tank
Proposed system should be
constructed in a way to                                                                      Proposed                                                                  Proposed
maximize evapotranspiration                                                                  Amenities Block                                                           450L
and minimize potential                                                                       (Approx RL 84)                                                            Pump
pooling and runoff.                                                                                                                                                    Well
If plans were not available at
the time of investigation
further reporting and design                                                                                                             Proposed
work may be needed prior to                                                                                                              4000L
council submission and                                                                                                                   Septic                  32-40mm Pump Well line
installation.                                                                                                              Proposed      Tank                    (Burried in a 200mm sand layer)
Care is to be taken not to                                                                                                 Amenities
compact,smear or damage                                                                                                    Block
the soil structure during
installation (This can lead to
premature failure).
If structures have been built
since our initial investigation
(Including neighboring
                                                                           82m




structures) please contact us
to confirm this will not
adversely effect the design.
Final landscaping and                                                                  BH4
installation should discourage                                                         PT2
and limit causal pedestrian
                                                                     BH5
access.(By way of plantings,                                                                           32mm Delivery line
                                                                     PT3
border, mounds, visual and                                                                             (Burried in a 200mm sand layer)
or physical deterrents)
The owner should obtain
knowledge on how to use
                                                           Slope
and maintain the proposed                                                        BH3
                                                           16-22%
system. Most of this is                                                          PT1
available from your chosen
supplier/installer.
This report must be                   Reserve Area         Proposed Surface
approved by the local council                              Irrigation Area - 400sqm
prior to any work                                          (10x 40m)
commencing.                                                (Approximate RL 101)
The effluent disposal
report must be
accompanied by a Site
Classification Report. If
the Site Classification is
H1,H2, E or P an
articulation joint will need
to be designed by a
person licensed to do so.

Client- QRE Consruction
Site - 332 Eastern Branch Road, Kin Kin
                                                                                                                                                                                                   Ground Drill Pty Ltd
Date - 11/11/22
                                                                                                                                  Abbreviations                                                    Sunshine Coast, QLD.
Job# - 22/388
                                                                                                                                  BH : Borehole           DCP : Dynamic Cone Penetrometer          QBCC # 150 345 80
Scale - 1 : 2000 @ A4 (Site features are approximate-Do not scale)
                                                                                                                                  PT : Percolation Test   HD : Heavy Droplet Lilac Sprinkler       E: [email protected]
                                                                                                                                  TV : Turf Valve         RWT : Rain Water Tank                    W: www.grounddrill.com.au
                                                                                                                                                                                                   P: 0407 035 220

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.