Decision Notice - Change to an Existing Approval - 010.2004.00004206.001 [As Published] · 132004.4206.02
2004/4206
30. A new 2.0 metre wide concrete path shall be constructed along Gympie Terrace and frontage
and a 1.5 metre wide concrete path along Mill Street frontage of the site in accordance with
Council’s design standards and to an alignment that protects any significant vegetation or any
underground services. A Development Permit for Operational Works shall be required.
31. All paths shall be designed and constructed to ensure pedestrian safety using non-slip
materials and to produce an evenly graded surface finish.
32. All redundant vehicular crossings to the site shall be removed. Kerb & channel shall be
replaced for the full Gympie Terrace frontage of Lots 2, 3 & 4 (approx 51 metres). Also, all
redundant kerb drainage outlets from the site shall be removed.
33. Kerb & channel, footpath paving and landscaping such as trees and grasses shall be carried
out in accordance with Council’s Standard specifications.
Stormwater Drainage
34. All stormwater drainage shall be collected on site and discharged to Council’s existing
drainage structures in both Gympie Terrace and Mill Street, generally in accordance to plan
04601- C1 issue A dated 22/09/2004. Detailed plans of the drainage design shall be prepared
by a Registered Professional Civil Engineer and submitted to Council prior to obtaining a
Development Permit for Operational Works.
35. The drainage design shall include adequate scour protection at the stormwater outlet into the
open drain in Mill Street.
36. To ensure that polluted run-off does not enter Council’s stormwater drainage system,
stormwater run-off from the carparking areas and the driveways shall have the first flush (the
first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor provided on site prior to
being permitted to discharge into Council’s drainage system.
All other clean stormwater, such as roof water, can be collected on site and discharged
through a single underground drain line directly into the existing drainage system, bypassing
the grease/oil arrestor.
To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
arrestors, which shall be submitted to the Council for approval prior to obtaining a
Development Permit for Operational Works.
The approved maintenance plan shall be incorporated in the Community Management
Schemes for the development and a copy of this shall be provided for Council’s records prior
to commencement of the approved Use.
A Development Permit for Building Works shall not be granted until a Development Permit for
Operational Works has been issued in regard to the drainage scheme.
37. All site stormwater drainage shall be by means of a gravity system.
38. All common use drainage pits and pipelines shall be located within a drainage or services
easement.
39. All stormwater drainage lines including inter-allotment drainage shall be inspected by closed
circuit television (CCTV) prior to commencement of the approved Use.
40. CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council
following satisfactory completion of construction works. The developer will be responsible for
the full cost of CCTV inspection, including any additional inspection necessary following defect
identification and rectification. This charge is payable prior to the issue of Operational Works
approval and will be determined on the unit rate basis current at the time of approval.
Page 5 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2004.00004206.001 [As Published]Related documentApplication case desk ↗
Decision Notice - Change to an Existing Approval - 010.2004.00004206.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 81 KB (small file)
- File type
No other editions are linked here.