61. The carparking area shall be designed to comply with the provisions of AS 2890.1-2004 with
allowance for vehicles to enter and leave the site in a forward gear and with a minimum head
clearance (headroom) at any point of 2.2m.
62. All carparking shall be kept, maintained and line-marked in a condition fit for use.
Sewer
63. The bins enclosure shall be provided with a gully pit connected to the sewer system.
64. The existing sewer main that traverses the northwest corner of the site and the ‘zone of
influence’ (taken as the area within a 45-degree angle measured from the invert of the sewer
main to the finished surface level) of the sewer main shall be accurately located and
determined by a licensed Surveyor and shown on all plans submitted for Operational Works
approval.
To ensure Council’s sewer main is accessible for maintenance purposes and is protected from
risk of damage no structures requiring a building permit (eg. buildings, swimming pools,
retaining walls, raised terraces, etc) shall be constructed within this ‘zone of influence’ and as
such the applicant shall amend Operational Works plans including Building plans to ensure
compliance.
Therefore the layout of the proposed pool and terrace on proposed Lot 1 at the rear of unit 1
shall be modified to ensure compliance with the above.
Service Easements
65. No building or other structure shall be constructed or encroach over an easement. Any
building or structure within proximity of an easement or any other public utility’s underground
must have its foundations designed so that no surcharge loads are imposed upon such
underground infrastructure. Foundations must be taken down a minimum of 1 metre below a
line of influence measured 1 metre in the direction of the foundation from the centreline of the
closest underground service and along the natural angle of repose of the foundation soil
type(s).
Plans, and supportive documents, detailing these proposed foundations shall be designed by
a registered practicing Geotechnical Engineer and submitted with the application for a
Development Permit for Operational Works.
Environmental Health
66. The developer must provide a suitably screened imperviously paved area large enough for all
refuse and recycling containers. A roofed wash down area is required with a cold-water tap,
hose and drain outlet connected to sewer.
67. Refuse containers must be provided in accordance with the requirements of the Environmental
Protection (Interim Waste) Regulations 1996 and (Waste Management) Regulation 2000, for
the storage and collection of refuse.
68. A Waste Management Plan is to be submitted for specified developments as determined by
the Manager Environmental Health Services for the day to day operation of the complex. The
Waste Management Plan is to be submitted to Council and approved prior to the issue of a
Development Permit for operational works.
69. The Waste Management Plan Strategy will include the following information:-
The types of waste that will be generated from the activities approved within the
development.
Estimated volumes or tonnage of recyclables within the generated waste stream
Estimated volumes or tonnage of waste generated from the activities.
Methods to be used for dealing with garden waste.
Page 8 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2004.00004206.001 [As Published]Related documentApplication case desk ↗
Decision Notice - Change to an Existing Approval - 010.2004.00004206.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 81 KB (small file)
- File type
No other editions are linked here.